Geotechnical uncertainty may be the most difficult risk to manage in construction. In design-build (DB), where the project’s price is fixed before design and in many cases the subsurface investigation is complete, the risk profile is fundamentally changed and the owner must address it. This paper assesses the potential of DB as a tool for addressing geotechnical uncertainty in public transportation projects by comparatively evaluating three successful approaches. The first case study involves the use of a geotechnical baseline report as a subsurface condition risk allocation tool. The second uses unit price pay items inside the larger lump sum contract to share the geotechnical risk with the design-builder. Finally, a “nested DB” landslide ...
Statistics, reliability analyses and risk estimates can be very useful decision-making tools in geot...
In 2009, the Michigan Department of Transportation (MDOT) became concerned about ongoing slope movem...
The fact that ground-related problems are a significant contributor to construction project delays a...
Awarding design-build (DB) contracts before a complete subsurface investigation is completed, makes ...
State highways agencies policies and procedures for articulating geotechnical information and requir...
Engineering and re-engineering issues related to ground conditions, have being consistently discusse...
Geo-Impuls is a Dutch nationwide programme with the aim to reduce geotechnical related failures in p...
Changes during the construction phase generate cost growth, schedule delays, and claims in any proje...
Soil uncertainties should be considered in the safety and economic evaluation of geotechnical struct...
1987DiMillio, A. F.PDFTech ReportFHWA-RD-87-011DTFH61-82-C-0075Geotechnical engineeringRisk analysis...
The Los Angeles Metro Rail Subway project is initially planned for 30 km (18 mi) of twin, 6-m (20-ft...
“Value Engineering” is a frequently found clause in Construction contracts in the USA, allowing cont...
Ground related problems and conditions can often adversely affect costs, completion time, profitabil...
The project consists of a middle school constructed on a previously undeveloped site. Site developme...
This presentation provides an overview of the ongoing implementation efforts for GeoTechTools, which...
Statistics, reliability analyses and risk estimates can be very useful decision-making tools in geot...
In 2009, the Michigan Department of Transportation (MDOT) became concerned about ongoing slope movem...
The fact that ground-related problems are a significant contributor to construction project delays a...
Awarding design-build (DB) contracts before a complete subsurface investigation is completed, makes ...
State highways agencies policies and procedures for articulating geotechnical information and requir...
Engineering and re-engineering issues related to ground conditions, have being consistently discusse...
Geo-Impuls is a Dutch nationwide programme with the aim to reduce geotechnical related failures in p...
Changes during the construction phase generate cost growth, schedule delays, and claims in any proje...
Soil uncertainties should be considered in the safety and economic evaluation of geotechnical struct...
1987DiMillio, A. F.PDFTech ReportFHWA-RD-87-011DTFH61-82-C-0075Geotechnical engineeringRisk analysis...
The Los Angeles Metro Rail Subway project is initially planned for 30 km (18 mi) of twin, 6-m (20-ft...
“Value Engineering” is a frequently found clause in Construction contracts in the USA, allowing cont...
Ground related problems and conditions can often adversely affect costs, completion time, profitabil...
The project consists of a middle school constructed on a previously undeveloped site. Site developme...
This presentation provides an overview of the ongoing implementation efforts for GeoTechTools, which...
Statistics, reliability analyses and risk estimates can be very useful decision-making tools in geot...
In 2009, the Michigan Department of Transportation (MDOT) became concerned about ongoing slope movem...
The fact that ground-related problems are a significant contributor to construction project delays a...