One type of delay that often give rise to dispute is concurrent delay, where contractor delay occurs or has effect concurrently with employer delay. Concurrent delay makes the contractor claiming for extension of time and also possibly claiming for additional cost, while on the other hand the employer stand that the contractor has no right to get extension of time nor additional cost, but liquidated damages that shall be borne. In relation with delay in construction contract, it was clear that various events had occurred concurrently with one another, particularly towards the end of the project, which all potentially caused delays to completion. Some of these were relevant events under the construction contract, and some were events, which ...
Concurrent delays on construction projects have been described as being the most conceptionally chal...
Due to the character of the original source materials and the nature of batch digitization, quality ...
Delays are a common feature of construction projects and frequently lead to disputes between the par...
Construction delay claims are inevitable in most projects in the construction industry. It is rarely...
Methods for Analysing Concurrent Delays in Sri Lankan Construction Industry Difficulties arise when...
In the UK over the last 50 years, legal developments in relation to extensions of time and/or moneta...
Most of construction projects suffer from delays. These delays could be due to several reasons such ...
Construction projects are complex, from their design to the execution phase. Delivering a project on...
Delays in construction projects schedule is one of the most noticed problems. Delays may be caused b...
This thesis was submitted for the award of Doctor of Philosophy and was awarded by Brunel University...
Various theories, concepts and methodologies exist for apportioning liabilities in construction del...
Abstract: The purpose of this research was to provide an understanding of what causes delays and cla...
Delay analysis and schedule compression are normally treated as separate, independent, aspects of th...
Achieving a project whose punctually in completion date and duration is one of the main purposes of ...
It was observed that the consideration of concurrency in delay claims in Sri Lankan construction ind...
Concurrent delays on construction projects have been described as being the most conceptionally chal...
Due to the character of the original source materials and the nature of batch digitization, quality ...
Delays are a common feature of construction projects and frequently lead to disputes between the par...
Construction delay claims are inevitable in most projects in the construction industry. It is rarely...
Methods for Analysing Concurrent Delays in Sri Lankan Construction Industry Difficulties arise when...
In the UK over the last 50 years, legal developments in relation to extensions of time and/or moneta...
Most of construction projects suffer from delays. These delays could be due to several reasons such ...
Construction projects are complex, from their design to the execution phase. Delivering a project on...
Delays in construction projects schedule is one of the most noticed problems. Delays may be caused b...
This thesis was submitted for the award of Doctor of Philosophy and was awarded by Brunel University...
Various theories, concepts and methodologies exist for apportioning liabilities in construction del...
Abstract: The purpose of this research was to provide an understanding of what causes delays and cla...
Delay analysis and schedule compression are normally treated as separate, independent, aspects of th...
Achieving a project whose punctually in completion date and duration is one of the main purposes of ...
It was observed that the consideration of concurrency in delay claims in Sri Lankan construction ind...
Concurrent delays on construction projects have been described as being the most conceptionally chal...
Due to the character of the original source materials and the nature of batch digitization, quality ...
Delays are a common feature of construction projects and frequently lead to disputes between the par...