The availability of repairable technical systems depends on the availability of (repairable) spare parts, to be influenced by (1) inventory levels and (2) repair capacity. In this paper, we present a procedure for simultaneous optimisation of these two factors. Our method is based on a modification of the well-known VARI-METRIC procedure for determining near-optimal spare part inventory levels and results for multi-class, multi-server queuing systems representing repair shops. The modification is required to avoid non-convexity problems in the optimisation procedure. To include part-time and overtime working, we allow for a non-integer repair capacity. To this end, we develop a simple approximation for queuing systems with a non-integer num...
We consider the integrated planning of spare parts and service engineers that are needed for serving...
In this study, we address the design problem of a single repair shop in a repairable multi-item spar...
An effective spare part supply system planning is essential to achieve a high capital asset availabi...
The availability of repairable technical systems depends on the availability of (repairable) spare p...
In this paper, we examine the impact of repair priorities in spare part networks. Several heuristics...
Integral inventory control of repairable items in service networks can result in a significant gain ...
Capacity pooling in production systems, in the form of production capacity or inventory pooling, has...
To achieve a high system availability at minimal costs, relevant decisions include the choice of pre...
In this paper, we consider multi-echelon, multi-indenture supply systems for repairable service part...
Abstract—The focus of this paper is the analysis of the constraint on the repair resources caused by...
We study a spare part supply system for repairable spare parts where parallel repair servers may hav...
In the field of service logistics for capital goods, generally, metric type methods are used to deci...
We study a single location supply system for repairable spare parts. The system consists of a multi-...
AbstractExpensive parts of machines do not have to be discarded when broken. Instead they can be rep...
In the field of service logistics for capital goods, generally, metric type methods are used to deci...
We consider the integrated planning of spare parts and service engineers that are needed for serving...
In this study, we address the design problem of a single repair shop in a repairable multi-item spar...
An effective spare part supply system planning is essential to achieve a high capital asset availabi...
The availability of repairable technical systems depends on the availability of (repairable) spare p...
In this paper, we examine the impact of repair priorities in spare part networks. Several heuristics...
Integral inventory control of repairable items in service networks can result in a significant gain ...
Capacity pooling in production systems, in the form of production capacity or inventory pooling, has...
To achieve a high system availability at minimal costs, relevant decisions include the choice of pre...
In this paper, we consider multi-echelon, multi-indenture supply systems for repairable service part...
Abstract—The focus of this paper is the analysis of the constraint on the repair resources caused by...
We study a spare part supply system for repairable spare parts where parallel repair servers may hav...
In the field of service logistics for capital goods, generally, metric type methods are used to deci...
We study a single location supply system for repairable spare parts. The system consists of a multi-...
AbstractExpensive parts of machines do not have to be discarded when broken. Instead they can be rep...
In the field of service logistics for capital goods, generally, metric type methods are used to deci...
We consider the integrated planning of spare parts and service engineers that are needed for serving...
In this study, we address the design problem of a single repair shop in a repairable multi-item spar...
An effective spare part supply system planning is essential to achieve a high capital asset availabi...