It is planned to upgrade the SRRC booster from 1.3 GeV to 1.5 GeV for full energy injection into the storage ring before the end of 1999. Based on the technical specification and operation experience, it is concluded that some of the subsystem components need to be rebuilt, such as the magnet power supply systems and beam extraction elements. A review of the power supply system will be reported elsewhere. In this report, the brief review of the beam extraction process is given according to the 1.5 GeV parameters. The test result of a modified kicker magnet is presented.
Since its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which ...
Many types of diagnostic instruments, such as beam position monitors, fluorescence screen monitors, ...
Each stage of an accelerator system has a limited dynamic range and therefore a chain of stages is r...
Installation of a beam excitation kicker at the SRRC (Synchrotron Radiation Research Center) booster...
Current status and future development of SRRC are reported in this paper. Machine reliability, beam ...
Current status and future development of SRRC are reported in this paper. Machine reliability, beam ...
The kicker magnets are installed in the vacuum chamber at the extraction section of the RCS (Rapid C...
The ELETTRA linear injector that provides a maximum energy of 1.2 GeV will be replaced by a new boos...
The booster operation parameters, such as synchrotron tune, 70 betatron tune, momentum compaction fa...
The PLS injects 2.0 GeV electron beams from Linac to storage ring (SR). After storing the current to...
The PLS injects 2.0 GeV electron beams from Linac to storage ring (SR). After storing the current to...
The Advanced Light Source (ALS) will soon be upgraded to enable top-off operations [1], in which ele...
A fast extraction kicker system has been installed in the SPS and successfully used in extraction te...
A fast extraction kicker system has been installed in the SPS and successfully used in extraction te...
Installation of the kicker magnets in the extraction section of the rapid cycling synchrotron in the...
Since its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which ...
Many types of diagnostic instruments, such as beam position monitors, fluorescence screen monitors, ...
Each stage of an accelerator system has a limited dynamic range and therefore a chain of stages is r...
Installation of a beam excitation kicker at the SRRC (Synchrotron Radiation Research Center) booster...
Current status and future development of SRRC are reported in this paper. Machine reliability, beam ...
Current status and future development of SRRC are reported in this paper. Machine reliability, beam ...
The kicker magnets are installed in the vacuum chamber at the extraction section of the RCS (Rapid C...
The ELETTRA linear injector that provides a maximum energy of 1.2 GeV will be replaced by a new boos...
The booster operation parameters, such as synchrotron tune, 70 betatron tune, momentum compaction fa...
The PLS injects 2.0 GeV electron beams from Linac to storage ring (SR). After storing the current to...
The PLS injects 2.0 GeV electron beams from Linac to storage ring (SR). After storing the current to...
The Advanced Light Source (ALS) will soon be upgraded to enable top-off operations [1], in which ele...
A fast extraction kicker system has been installed in the SPS and successfully used in extraction te...
A fast extraction kicker system has been installed in the SPS and successfully used in extraction te...
Installation of the kicker magnets in the extraction section of the rapid cycling synchrotron in the...
Since its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which ...
Many types of diagnostic instruments, such as beam position monitors, fluorescence screen monitors, ...
Each stage of an accelerator system has a limited dynamic range and therefore a chain of stages is r...