This paper demonstrates the application of the reliability-centred maintenance (RCM) process to analyse and develop preventive maintenance tasks for electric multiple units (EMU) in the East Rail of the Kowloon-Canton Railway Corporation (KCRC). Two systems, the 25 kV electrical power supply and the air-conditioning system of the EMU, have been chosen for the study. RCM approach on the two systems is delineated step by step in the paper. This study confirms the feasibility and effectiveness of RCM applications on the maintenance of electric trains
729579849Final report.PDFTech ReportCA-MTI-10-2913MTI Report 10-06DTRT 07-G-0054Railroad engineering...
PT Kereta Api Indonesia (PT KAI) is a Government-owned corporation that provide train as mass public...
Electric vehicles (EVs) are mainly known for their advantages as emission free, energy efficient and...
This paper demonstrates the application of the reliability-centred maintenance (RCM) process to anal...
Abstract The purpose of maintaining rolling stock is to perform train service without failure during...
This thesis is an effort to implement Reliability Centered Maintenance “RCM” for C20trains at Tunnel...
The success of maintenance program for PT KERETA API (Persero) locomotives plays important role in ...
Abstract- The increase number of high speed trains needs an high reliable and available railway over...
Reliability-centered maintenance (RCM) is a well-established method for preventive maintenance plan...
This research project primarily aims to develop two pieces of knowledge: - Identify whether Rio...
It can be assumed that at least some of the systems associated with the train traffic operation work...
The purpose of this qualitative case study was to identify the types of obstacles and patterns exper...
Power system interface with electrified railways (ER), auxiliary power, hybrid trains, electromagnet...
Presently public road mass transportation organisations maintain their vehicles using scheduled corr...
The purpose of this qualitative case study was to identify the types of obstacles and patterns exper...
729579849Final report.PDFTech ReportCA-MTI-10-2913MTI Report 10-06DTRT 07-G-0054Railroad engineering...
PT Kereta Api Indonesia (PT KAI) is a Government-owned corporation that provide train as mass public...
Electric vehicles (EVs) are mainly known for their advantages as emission free, energy efficient and...
This paper demonstrates the application of the reliability-centred maintenance (RCM) process to anal...
Abstract The purpose of maintaining rolling stock is to perform train service without failure during...
This thesis is an effort to implement Reliability Centered Maintenance “RCM” for C20trains at Tunnel...
The success of maintenance program for PT KERETA API (Persero) locomotives plays important role in ...
Abstract- The increase number of high speed trains needs an high reliable and available railway over...
Reliability-centered maintenance (RCM) is a well-established method for preventive maintenance plan...
This research project primarily aims to develop two pieces of knowledge: - Identify whether Rio...
It can be assumed that at least some of the systems associated with the train traffic operation work...
The purpose of this qualitative case study was to identify the types of obstacles and patterns exper...
Power system interface with electrified railways (ER), auxiliary power, hybrid trains, electromagnet...
Presently public road mass transportation organisations maintain their vehicles using scheduled corr...
The purpose of this qualitative case study was to identify the types of obstacles and patterns exper...
729579849Final report.PDFTech ReportCA-MTI-10-2913MTI Report 10-06DTRT 07-G-0054Railroad engineering...
PT Kereta Api Indonesia (PT KAI) is a Government-owned corporation that provide train as mass public...
Electric vehicles (EVs) are mainly known for their advantages as emission free, energy efficient and...