A report on the challenges confronting the Fermilab Linac and Booster accelerators is presented. Plans to face those challenges are discussed. Historically, the Linac/Booster system has served only as an injector for the relatively low repetition rate Main Ring synchrotron. With construction of an 8 GeV target station for the 5 Hz MiniBooNE neutrino beam and requirements for rapid multi-batch injection into the Main Injector for the NUMI/MINOS experiment, the demand for 8 GeV protons will increase more than an order of magnitude above recent high levels. To meet this challenge, enhanced ion source performance, better Booster orbit control, a beam loss collimation/localization system, and improved diagnostics are among the items being pursue...
A linac injector for a new proton source complex at Fermilab is assumed to have a kinetic energy of ...
Abstract The performance of the Fermilab proton accelerator complex is reviewed. The coming into ope...
textThe Neutrinos at the Main Injector (NuMI) neutrino beam facility began operating at the Fermi N...
Beam loss reduction and control challenges confronting the Fermilab Booster are presented in the con...
The Fermilab Project X R&D program is focused on the design of a new proton source utilizing a s...
During its 30 years of operation, the Fermilab Booster has served only as an injector for the relati...
During its 30 years of operation, the Fermilab Booster has served only as an injector for the relati...
The Fermilab Steering Group has developed a plan to keep U.S. accelerator-based particle physics on ...
The NuMI beam at Fermilab has delivered over 5 x 10{sup 20} 120 GeV protons to the neutrino producti...
The Fermilab Booster is a bottleneck limiting the proton beam intensity in the accelerator complex. ...
Over the past year a team in the Beams Division has been working on the proton driver for Fermilab. ...
In order to enhance Fermilab hadron research program and to provide a proton source to a future muon...
Abstract. The Neutrinos at the Main Injector (NuMI) facility at Fermilab is due to begin operations ...
Using the PARMILA code running under PC-WINDOWS, the present performance of the Fermilab Drift Tube ...
There are three types of future neutrino facilities currently under study, one based on decays of st...
A linac injector for a new proton source complex at Fermilab is assumed to have a kinetic energy of ...
Abstract The performance of the Fermilab proton accelerator complex is reviewed. The coming into ope...
textThe Neutrinos at the Main Injector (NuMI) neutrino beam facility began operating at the Fermi N...
Beam loss reduction and control challenges confronting the Fermilab Booster are presented in the con...
The Fermilab Project X R&D program is focused on the design of a new proton source utilizing a s...
During its 30 years of operation, the Fermilab Booster has served only as an injector for the relati...
During its 30 years of operation, the Fermilab Booster has served only as an injector for the relati...
The Fermilab Steering Group has developed a plan to keep U.S. accelerator-based particle physics on ...
The NuMI beam at Fermilab has delivered over 5 x 10{sup 20} 120 GeV protons to the neutrino producti...
The Fermilab Booster is a bottleneck limiting the proton beam intensity in the accelerator complex. ...
Over the past year a team in the Beams Division has been working on the proton driver for Fermilab. ...
In order to enhance Fermilab hadron research program and to provide a proton source to a future muon...
Abstract. The Neutrinos at the Main Injector (NuMI) facility at Fermilab is due to begin operations ...
Using the PARMILA code running under PC-WINDOWS, the present performance of the Fermilab Drift Tube ...
There are three types of future neutrino facilities currently under study, one based on decays of st...
A linac injector for a new proton source complex at Fermilab is assumed to have a kinetic energy of ...
Abstract The performance of the Fermilab proton accelerator complex is reviewed. The coming into ope...
textThe Neutrinos at the Main Injector (NuMI) neutrino beam facility began operating at the Fermi N...