Bromilow’s time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and...
A strong relationship exists between the cost and duration of construction projects. This relationsh...
This study establishes a comparison approach for indexes between Vietnam and Taiwan, in order to det...
Project time–cost relationships were examined by using project scope factors as predictors for 161 c...
The concept of construction time has been mentioned by most researchers as one of the key factors of...
Bromilow's log-log time-cost (BTC) model is tested and refitted with a new set of data for Australia...
Bromilow’s log-log time-cost (BTC) model is tested and refitted with a new set of data for Australia...
The concept of time-cost relationship in construction projects was first introduced by Bromilow. Bro...
The duration of Australian construction has been modelled by a time-cost formula expressed in the fo...
WOS: 000518474000004The concept of time-cost relationship in construction projects was first introdu...
Thời gian hoàn thành dự án đóng vai trò quan trọng trong giai đoạn đầu của các dự án xây dựng. Nghiê...
Construction duration is one of the key elements to determine the success of a project. Several mode...
Bromilow’s log-log time-cost (BTC) model is tested and refitted with a new set of data for Australia...
Studies indicate that there is a relationship between project cost and construction time within cons...
Time and price of contracted construction as well as their overrun are among highly pronounced issue...
With the economic development, Vietnamese construction industry also progresses at a brisk pace and ...
A strong relationship exists between the cost and duration of construction projects. This relationsh...
This study establishes a comparison approach for indexes between Vietnam and Taiwan, in order to det...
Project time–cost relationships were examined by using project scope factors as predictors for 161 c...
The concept of construction time has been mentioned by most researchers as one of the key factors of...
Bromilow's log-log time-cost (BTC) model is tested and refitted with a new set of data for Australia...
Bromilow’s log-log time-cost (BTC) model is tested and refitted with a new set of data for Australia...
The concept of time-cost relationship in construction projects was first introduced by Bromilow. Bro...
The duration of Australian construction has been modelled by a time-cost formula expressed in the fo...
WOS: 000518474000004The concept of time-cost relationship in construction projects was first introdu...
Thời gian hoàn thành dự án đóng vai trò quan trọng trong giai đoạn đầu của các dự án xây dựng. Nghiê...
Construction duration is one of the key elements to determine the success of a project. Several mode...
Bromilow’s log-log time-cost (BTC) model is tested and refitted with a new set of data for Australia...
Studies indicate that there is a relationship between project cost and construction time within cons...
Time and price of contracted construction as well as their overrun are among highly pronounced issue...
With the economic development, Vietnamese construction industry also progresses at a brisk pace and ...
A strong relationship exists between the cost and duration of construction projects. This relationsh...
This study establishes a comparison approach for indexes between Vietnam and Taiwan, in order to det...
Project time–cost relationships were examined by using project scope factors as predictors for 161 c...