Goal programming a b s t r a c t Crew members on cruise ships are hired in a global labor market, and a major cost for cruise lines is mov-ing crewmembers from their home cities to the cruise ship’s departure port. Complicating the crew sched-uling problem is the uncertainty due to no-shows, terminations, and other reasons for crew to terminate their contract prematurely. To address this problem, this paper describes a scheduling system that imple-ments a two-stage planning process that first determines overbooking levels for the number of crew to offer contracts to, and then second, a goal integer programming formulation to minimize the movement cost of assigning crew to ships while maintaining adequate crew levels and a desired crew regio...
The Cruise Itinerary Schedule Design (CISD) problem determines the optimal sequence of a given set o...
With cockpit crew costs being the second largest costs of an airline, making optimal use of the avai...
The human resources allocation (HRA) is a major issue for container terminals. The workload is organ...
The article of record as published may be located at http://dx.doi.org/10.1016/j.cie.2012.08.011Crew...
Seaborne shipping must often cope with issues related to planning, ship scheduling, and arranging cr...
Crew scheduling is an extensive and important subject for scheduling problems in optimization. It is...
For decades decision support systems are an integral part of business information management systems...
One of the mayor problems of programming a cruise circuit is to decide which destinations to include...
The maritime industry is huge and consists of a lot of complex processes. It is a consequenceofthefa...
Over the last few decades, competition among maritime container terminals has increased due to large...
Optimization techniques for the scheduling of employees have been widely studied in many areas of th...
Due to crew costs being a significant proportion of operational costs and sophisticated requirements...
A cruise company faces three decision problems: at a strategic level, to decide in which maritime ar...
The increased capacities of merchant ships in the last decades as well as tighter port frequencies a...
Traditional methods model the billion-dollar airline crew scheduling problem as deterministic and do...
The Cruise Itinerary Schedule Design (CISD) problem determines the optimal sequence of a given set o...
With cockpit crew costs being the second largest costs of an airline, making optimal use of the avai...
The human resources allocation (HRA) is a major issue for container terminals. The workload is organ...
The article of record as published may be located at http://dx.doi.org/10.1016/j.cie.2012.08.011Crew...
Seaborne shipping must often cope with issues related to planning, ship scheduling, and arranging cr...
Crew scheduling is an extensive and important subject for scheduling problems in optimization. It is...
For decades decision support systems are an integral part of business information management systems...
One of the mayor problems of programming a cruise circuit is to decide which destinations to include...
The maritime industry is huge and consists of a lot of complex processes. It is a consequenceofthefa...
Over the last few decades, competition among maritime container terminals has increased due to large...
Optimization techniques for the scheduling of employees have been widely studied in many areas of th...
Due to crew costs being a significant proportion of operational costs and sophisticated requirements...
A cruise company faces three decision problems: at a strategic level, to decide in which maritime ar...
The increased capacities of merchant ships in the last decades as well as tighter port frequencies a...
Traditional methods model the billion-dollar airline crew scheduling problem as deterministic and do...
The Cruise Itinerary Schedule Design (CISD) problem determines the optimal sequence of a given set o...
With cockpit crew costs being the second largest costs of an airline, making optimal use of the avai...
The human resources allocation (HRA) is a major issue for container terminals. The workload is organ...