The CLIC Test Facility 3 (CTF3) is being built and com-missioned by an international collaboration to test the fea-sibility of the proposed Compact Linear Collider (CLIC) drive beam generation scheme. Central to this scheme is the use of RF deflectors to inject bunches into a delay loop and a combiner ring, in order to transform the initial bunch frequency of 1.5 GHz from the linac to a final bunch fre-quency of 12 GHz. The optimization procedure relies on several steps. The active length of each ring is carefully adjusted to within less than millimeter accuracy using a wiggler magnet. The transverse optics of the machine must be set up in a way to ensure beam isochronicity. Diagnos-tics based on optical Streak camera and RF power mea-surem...
In CLIC, the rf power to accelerate the main beam is produced by decelerating a drive beam. The Test...
The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasib...
The Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of t...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration to...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration to...
The aim of the CLIC Test Facility CTF3 at CERN is to prove the feasibility of key issues of the two-...
The aim of the CLIC Test Facility CTF3 at CERN is to demonstrate the feasibility of key points of th...
The aim of the CLIC Test Facility CTF3 at CERN is to demonstrate the feasibility of the key points o...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration in...
In the framework of the CLIC RF power source studies, the feasibility of the electron bunch train co...
The aim of the CLIC (Compact Linear Collider) Study is to investigate the feasibility of a high lumi...
The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasi...
The CLIC Test Facility (CTF3) was built to demonstrate the feasibility of the CLIC two beam accelera...
In the framework of the CLIC (Compact Linear Collider) RF power source studies, the scheme of electr...
The objective of the CLIC Test Facility CTF3, built at CERN by an international collaboration, is to...
In CLIC, the rf power to accelerate the main beam is produced by decelerating a drive beam. The Test...
The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasib...
The Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of t...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration to...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration to...
The aim of the CLIC Test Facility CTF3 at CERN is to prove the feasibility of key issues of the two-...
The aim of the CLIC Test Facility CTF3 at CERN is to demonstrate the feasibility of key points of th...
The aim of the CLIC Test Facility CTF3 at CERN is to demonstrate the feasibility of the key points o...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration in...
In the framework of the CLIC RF power source studies, the feasibility of the electron bunch train co...
The aim of the CLIC (Compact Linear Collider) Study is to investigate the feasibility of a high lumi...
The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasi...
The CLIC Test Facility (CTF3) was built to demonstrate the feasibility of the CLIC two beam accelera...
In the framework of the CLIC (Compact Linear Collider) RF power source studies, the scheme of electr...
The objective of the CLIC Test Facility CTF3, built at CERN by an international collaboration, is to...
In CLIC, the rf power to accelerate the main beam is produced by decelerating a drive beam. The Test...
The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasib...
The Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of t...