gration of production and delivery is critical in the case of Ready Mix Concrete, as it expires approximately an hour and a half after it is produced. This MS algorithm is based on specifically designed coding that, upon simulation, provides the good-ness-of-fit of the analysed solution. Examples have been generated on the basis of real case data. The obtained results validate the efficiency of the MS algorithm. Key words: production and delivery scheduling, ready mix concrete, Multi-start algorithm
The coordination of just-in-time production and transportation in a network of partially independent...
The increasing number of prefabrication projects has increased the demand for precast concrete (PC) ...
Prefabrication is not only economically optimal but also environmentally sustainable; hence, it is t...
This research aims to develop daily schedules by solving a model that addresses both the batching of...
Nowadays, the ready-mixed concrete (RMC) industry plays an important role in construction projects,...
Ready-Mixed Concrete (RMC) is a perishable product; hence, specifications such as ASTM C94 recommend...
From an operational point of view, Ready-Mixed Concrete Suppliers are faced with challenging operati...
The use of ready-mixed concrete primarily involves two parties, the supplier and the customer (who i...
In this research, we develop an integrated model that combines ready mixed concrete (RMC) production...
Demand for concrete, regardless of the geographical location, is increasing globally. While the Read...
Companies in the concrete industry are facing the following scheduling problem on a daily basis: con...
The coordination of just-in-time production and transportation in a network of partially independent...
This research proposes Bee Algorithm (BA) to optimize Ready Mixed Concrete (RMC) truck scheduling pr...
Construction project control requires reliable delivery schedules. The delivery schedule decisions e...
Concrete suppliers are faced with an impressive number of operational challenges – including the acq...
The coordination of just-in-time production and transportation in a network of partially independent...
The increasing number of prefabrication projects has increased the demand for precast concrete (PC) ...
Prefabrication is not only economically optimal but also environmentally sustainable; hence, it is t...
This research aims to develop daily schedules by solving a model that addresses both the batching of...
Nowadays, the ready-mixed concrete (RMC) industry plays an important role in construction projects,...
Ready-Mixed Concrete (RMC) is a perishable product; hence, specifications such as ASTM C94 recommend...
From an operational point of view, Ready-Mixed Concrete Suppliers are faced with challenging operati...
The use of ready-mixed concrete primarily involves two parties, the supplier and the customer (who i...
In this research, we develop an integrated model that combines ready mixed concrete (RMC) production...
Demand for concrete, regardless of the geographical location, is increasing globally. While the Read...
Companies in the concrete industry are facing the following scheduling problem on a daily basis: con...
The coordination of just-in-time production and transportation in a network of partially independent...
This research proposes Bee Algorithm (BA) to optimize Ready Mixed Concrete (RMC) truck scheduling pr...
Construction project control requires reliable delivery schedules. The delivery schedule decisions e...
Concrete suppliers are faced with an impressive number of operational challenges – including the acq...
The coordination of just-in-time production and transportation in a network of partially independent...
The increasing number of prefabrication projects has increased the demand for precast concrete (PC) ...
Prefabrication is not only economically optimal but also environmentally sustainable; hence, it is t...