GB reviews information in the applicant's safety analysis report (SAR) related to the existence of a potential for surface faulting affecting the site. The informa-tion presented in this section results largely from detailed surface and subsurface geological and geophysical investigations performed in the site and vicinity. The following specific subjects are addressed: the structural and stratigraphic condi-tions of the site and vicinity (subsection 2.5.3.1), any evidence of fault offset or evidence demonstrating the absence of faulting (subsection 2.5.3.2), earthquakes associated with faults (subsection 2.5.3.3), determination of age of most recent movement on faults (subsection 2.5.3.4), determination of structural relationships of ...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
GB reviews the geologic and seismic information submitted in the applicant's safety analysis re...
Information, including analyses and substantiation, must be presented in the appli-cant's safet...
Reactor location is reviewed (1) as identified by latitude and longitude and by the UTM * coordinate...
Information must be presented by the applicant concerning the properties and sta-bility of all soils...
The geohydrological design basis of the plant (discussed in Regulatory Guide 1.59) is developed in t...
The applicant's assessment of possible hazards due.to missiles generated by the design basis to...
LQB reviews the plant administrative procedures, as described in the applicant's safety analysi...
The following areas of the applicant's safety analysis report (SAR) are reviewed as they relate...
The applicant's identification of potential accident situations in the vicinity of the plant is...
The areas of review include all the safety-related interfaces important to the staff review for safe...
The staff reviews the applicant's assessment of aircraft hazards. The purpose of the review is ...
The SAB reviews the population data in the site environs as presented in the appli-cant's SAR, ...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
GB reviews the geologic and seismic information submitted in the applicant's safety analysis re...
Information, including analyses and substantiation, must be presented in the appli-cant's safet...
Reactor location is reviewed (1) as identified by latitude and longitude and by the UTM * coordinate...
Information must be presented by the applicant concerning the properties and sta-bility of all soils...
The geohydrological design basis of the plant (discussed in Regulatory Guide 1.59) is developed in t...
The applicant's assessment of possible hazards due.to missiles generated by the design basis to...
LQB reviews the plant administrative procedures, as described in the applicant's safety analysi...
The following areas of the applicant's safety analysis report (SAR) are reviewed as they relate...
The applicant's identification of potential accident situations in the vicinity of the plant is...
The areas of review include all the safety-related interfaces important to the staff review for safe...
The staff reviews the applicant's assessment of aircraft hazards. The purpose of the review is ...
The SAB reviews the population data in the site environs as presented in the appli-cant's SAR, ...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...