At the construction permit (CP) stage of review, ETSB reviews the information in the applicant's safety analysis report (SAR) in the areas listed below. At the operating license (OL) stage, the ETSB review consists of confirming the design accepted at the CP stage and evaluating the adequacy of the applicant's technical specifications in these areas. The specific ETSB review areas are as follows: 1. The engineered safety feature (ESF) atmosphere cleanup systems designed for fission product removal in post-accident environments. These generally include primary systems, such as in-containment recirculation, and secondary systems, such as standby gas treatment systems and emergency or post accident air cleaning systems for the fuel h...
The RSB reviews the information presented in the applicant's safety analysis report (SAR) regar...
The CSB reviews the information in the applicant's safety analysis report (SAR) con-cerning the...
The ASB review of the plant flood protection includes all structures, systems and components (SSC) w...
At the construction permit (CP) stage, ETSB reviews the information in the appli-cant's prelimi...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
At the construction permit (CP) stage of review, the CMEB reviews the information in the applicant&a...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
The function of the engineered safety feature ventilation system (ESFVS) is to provide a suitable an...
The branch with primary responsibility for reviewing human performance will review the corporate lev...
The ice condenser system is reviewed to determine the fission product removal effectiveness whenever...
At the construction permit (CP) stage of review, ASB reviews the information in the applicant's...
The ASB reviews the auxiliary and radwaste area ventilation system (ARAVS) from air intake to the po...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
that components of the reactor coolant boundary be designed, fabricated, erected and tested so as to...
The applicant's emergency planning, as described in his Safety Analysis Report (SAR), is review...
The RSB reviews the information presented in the applicant's safety analysis report (SAR) regar...
The CSB reviews the information in the applicant's safety analysis report (SAR) con-cerning the...
The ASB review of the plant flood protection includes all structures, systems and components (SSC) w...
At the construction permit (CP) stage, ETSB reviews the information in the appli-cant's prelimi...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
At the construction permit (CP) stage of review, the CMEB reviews the information in the applicant&a...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
The function of the engineered safety feature ventilation system (ESFVS) is to provide a suitable an...
The branch with primary responsibility for reviewing human performance will review the corporate lev...
The ice condenser system is reviewed to determine the fission product removal effectiveness whenever...
At the construction permit (CP) stage of review, ASB reviews the information in the applicant's...
The ASB reviews the auxiliary and radwaste area ventilation system (ARAVS) from air intake to the po...
The areas reviewed in this section of the applicant's safety analysis report (SAR) include thos...
that components of the reactor coolant boundary be designed, fabricated, erected and tested so as to...
The applicant's emergency planning, as described in his Safety Analysis Report (SAR), is review...
The RSB reviews the information presented in the applicant's safety analysis report (SAR) regar...
The CSB reviews the information in the applicant's safety analysis report (SAR) con-cerning the...
The ASB review of the plant flood protection includes all structures, systems and components (SSC) w...