The primary review function is performed by ETSB. At the construction permit (CP) stage, ETSB reviews the information in the applicant's preliminary safety analysis report (PSAR) in tfie specific areas that follow. During the operating license (OL) stage of review, the ETSB review consists of confirming the design accepted at the CP stage and evaluating the adequacy of the applicant's technical specifications in these areas. The ETSB review includes: 1. The liquid radwaste treatment system design, design objectives, design criteria, methods of treatment, expected releases, and principal parameters used in calculating the releases of radioactive materials in liquid effluents including the system piping and instrumentation diagrams ...
The following areas of the applicant's safety analysis report (SAR) are reviewed as they relate...
Both regulatory and technical concerns must be addressed in Argonne-conducted peer reviews of site c...
The branch with primary responsibility for reviewing human performance will review the corporate lev...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
At the construction permit (CP) stage, ETSB reviews the information in the appli-cant's prelimi...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
At the construction permit (CP) stage of review, ASB reviews the information in the applicant's...
At the construction permit (CP) stage of review, the CMEB reviews the information in the applicant&a...
The following areas of the applicant's safety analysis report (SAR) are reviewed, as they relat...
QAB reviews and evaluates the description of the quality assurance (QA) program for the design and c...
The requirements for the performance of radiological design reviews are codified in 10CFR835, Occupa...
The equipment and floor drainage system (EFDS) is designed to assure that waste liquids, valve and p...
The ASB reviews the auxiliary and radwaste area ventilation system (ARAVS) from air intake to the po...
The review under this SRP section covers the radiological consequences of the release of fission pro...
A treatability study is planned that encompasses the application of in situ vitrification (ISV) to a...
The following areas of the applicant's safety analysis report (SAR) are reviewed as they relate...
Both regulatory and technical concerns must be addressed in Argonne-conducted peer reviews of site c...
The branch with primary responsibility for reviewing human performance will review the corporate lev...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
At the construction permit (CP) stage, ETSB reviews the information in the appli-cant's prelimi...
At the construction permit (CP) stage of review, ETSB reviews the information in the applicant'...
At the construction permit (CP) stage of review, ASB reviews the information in the applicant's...
At the construction permit (CP) stage of review, the CMEB reviews the information in the applicant&a...
The following areas of the applicant's safety analysis report (SAR) are reviewed, as they relat...
QAB reviews and evaluates the description of the quality assurance (QA) program for the design and c...
The requirements for the performance of radiological design reviews are codified in 10CFR835, Occupa...
The equipment and floor drainage system (EFDS) is designed to assure that waste liquids, valve and p...
The ASB reviews the auxiliary and radwaste area ventilation system (ARAVS) from air intake to the po...
The review under this SRP section covers the radiological consequences of the release of fission pro...
A treatability study is planned that encompasses the application of in situ vitrification (ISV) to a...
The following areas of the applicant's safety analysis report (SAR) are reviewed as they relate...
Both regulatory and technical concerns must be addressed in Argonne-conducted peer reviews of site c...
The branch with primary responsibility for reviewing human performance will review the corporate lev...