The descriptive information, analyses, and referenced documents, including functional logic diagrams, functional piping and instrument diagrams, electrical single-line diagrams, tables, physical arrangement drawings, and electrical schematics, for the a-c onsite power system presented in the applicant's safety analysis report (SAR) are reviewed. The intent of the review is to determine that the a-c onsite power system satisfies the requirements of General Design Criteria 2, 4, 5 17, 18 and 50 and will perform Its intended functions during all plant operating and accident conditions. The a-c onsite power system includes those standby power sources, distribution systems, and vital supporting systems provided to supply power to safety-rel...
The applicant's identification of potential accident situations in the vicinity of the plant is...
The CSB reviews the information in the applicant's safety analysis report (SAR) con-cerning the...
The branch with primary responsibility for reviewing human performance will review the corporate lev...
The descriptive information, analyses, and referenced documents, including electrical single line di...
The ASB review of the plant flood protection includes all structures, systems and components (SSC) w...
The objective of this evaluation is to provide recommendations to ensure consistency between the tec...
The loss of nonemergency ac power is assumed to result in the loss of all power to the station auxil...
At the construction permit (CP) stage of review, the CMEB reviews the information in the applicant&a...
The ASB reviews the turbine area ventilation system (TAVS) from air intake to the point of discharge...
The NRC has stated its concern about the reliability of the offsite power system as the preferred em...
The ASB reviews the auxiliary and radwaste area ventilation system (ARAVS) from air intake to the po...
The ASB review of the structures, systems, and components (SSC) to be protected from externally gene...
The function of the engineered safety feature ventilation system (ESFVS) is to provide a suitable an...
The ultimate purpose of nuclear power plant safety systems is to prevent damage to the reactor and t...
The Site Electrical Power System receives and distributes utility power to all North Portal site use...
The applicant's identification of potential accident situations in the vicinity of the plant is...
The CSB reviews the information in the applicant's safety analysis report (SAR) con-cerning the...
The branch with primary responsibility for reviewing human performance will review the corporate lev...
The descriptive information, analyses, and referenced documents, including electrical single line di...
The ASB review of the plant flood protection includes all structures, systems and components (SSC) w...
The objective of this evaluation is to provide recommendations to ensure consistency between the tec...
The loss of nonemergency ac power is assumed to result in the loss of all power to the station auxil...
At the construction permit (CP) stage of review, the CMEB reviews the information in the applicant&a...
The ASB reviews the turbine area ventilation system (TAVS) from air intake to the point of discharge...
The NRC has stated its concern about the reliability of the offsite power system as the preferred em...
The ASB reviews the auxiliary and radwaste area ventilation system (ARAVS) from air intake to the po...
The ASB review of the structures, systems, and components (SSC) to be protected from externally gene...
The function of the engineered safety feature ventilation system (ESFVS) is to provide a suitable an...
The ultimate purpose of nuclear power plant safety systems is to prevent damage to the reactor and t...
The Site Electrical Power System receives and distributes utility power to all North Portal site use...
The applicant's identification of potential accident situations in the vicinity of the plant is...
The CSB reviews the information in the applicant's safety analysis report (SAR) con-cerning the...
The branch with primary responsibility for reviewing human performance will review the corporate lev...