National Roads Construction/Rehabilitation Programme: Why the consistently high contract price variations? Contract Price variations experienced on selected monitored projects between FY 2012/13 and Q2 FY 2014/15Table 1 shows the different contract price variations experienced on selected monitored projects under UNRA and their causes. The selected projects were in three categories noted above. Notable projects with high contract price variations include Jinja-Kamuli; Tororo-Mbale; and Mbale-Soroti roads where the variations have reached 68%, 110 % and 135 % respectively
The construction industry always faces problems on price fluctuation and adjustment of the price to ...
The optimum project performance would be achieved if the work invariably flows smoothly within time ...
The problems related to the traditional project procurement method are known to often lead to advers...
This paper presents a study of cost escalation in unit price road construction contracts. The aim is...
The state government plans to invest $18.1 billion in transport infrastructure across local, state a...
This paper assesses the patterns and trends of price fluctuations and price adjustment practices in ...
One of the most important problems in the construction industry is variation orders. Variation occur...
The Parties involved in the construction contract, The Employer, The Contractor and the Engineer mus...
One of the most important problems in the construction industry is variations. They occur in every c...
Sri Lanka is rapidly developing from the infrastructure sector with the emergence of huge and highly...
Variation orders have been globally identified as a significant reason for poor performance of const...
For any competitive tender for a construction project, the tender sums submitted by contractors are ...
Highways play a significant role in the economic growth of developing countries. Sri Lankan governme...
© 1985 Gaspar M. FundiThis report is an investigation made into four major areas of construction wor...
The construction industry has a major role in the development of Turkish economy. The construction s...
The construction industry always faces problems on price fluctuation and adjustment of the price to ...
The optimum project performance would be achieved if the work invariably flows smoothly within time ...
The problems related to the traditional project procurement method are known to often lead to advers...
This paper presents a study of cost escalation in unit price road construction contracts. The aim is...
The state government plans to invest $18.1 billion in transport infrastructure across local, state a...
This paper assesses the patterns and trends of price fluctuations and price adjustment practices in ...
One of the most important problems in the construction industry is variation orders. Variation occur...
The Parties involved in the construction contract, The Employer, The Contractor and the Engineer mus...
One of the most important problems in the construction industry is variations. They occur in every c...
Sri Lanka is rapidly developing from the infrastructure sector with the emergence of huge and highly...
Variation orders have been globally identified as a significant reason for poor performance of const...
For any competitive tender for a construction project, the tender sums submitted by contractors are ...
Highways play a significant role in the economic growth of developing countries. Sri Lankan governme...
© 1985 Gaspar M. FundiThis report is an investigation made into four major areas of construction wor...
The construction industry has a major role in the development of Turkish economy. The construction s...
The construction industry always faces problems on price fluctuation and adjustment of the price to ...
The optimum project performance would be achieved if the work invariably flows smoothly within time ...
The problems related to the traditional project procurement method are known to often lead to advers...