Abstract- The gap between financing need and the fund allocated brings governments difficult to manage the road maintenance, thus a ranking procedure is required to optimize this limited fund. Determining the road maintenance priority is considered as a multi-criteria decision making problem. Recent priority procedure offered by the Department of Public Works and previous researches only consider technical aspects such as pavement condition and daily traffic. However, non-technical factor such as political intervention plays a significant role in determining priority. This paper suggests a comprehensive assessment framework that enables to take a number of technical and non-technical factors into consideration. Analytic Hierarchy Process (A...
Salem is the fifth largest city with a population of 7.54 lakhs (2011) in Tamil Nadu. Local Authorit...
The Analytic Hierarchy Process (AHP) method has been employed in a previous study to determine Bali ...
Graduation date: 2005The prioritization of road maintenance projects is an important forest engineer...
This study aims to develop a model to choose maintenance strategies based on priority of criteria we...
Decision makers often perform pavements repairs without considering the maintenance priority and wit...
The application of Analytic Hierarchy Process (AHP) method for the prioritization of pavement mainte...
– Preservation of the reconstruction of a national road in Indonesia, has become full attention by t...
The road network tends to decrease the conditions indicated by the occurrence of damage to the road....
<p><strong>Abstrac</strong> :Road handling priority determination is an important tasks faced by dec...
In the current economic climate, budgets for the maintenance of public buildings are unlikely to mee...
Maintenance activities and pavement rehabilitation require the allocation of massive finances. Yet d...
Determination of road maintenance involves complex multi-criteria in decision making process. Analyt...
Determination of road maintenance involves complex multi-criteria in decision making process. Analyt...
The quality of roads as public goods should be maintained and improved time to time. In order to put...
Decision-making processes require the selection of appropriate and choose the optimal solution for i...
Salem is the fifth largest city with a population of 7.54 lakhs (2011) in Tamil Nadu. Local Authorit...
The Analytic Hierarchy Process (AHP) method has been employed in a previous study to determine Bali ...
Graduation date: 2005The prioritization of road maintenance projects is an important forest engineer...
This study aims to develop a model to choose maintenance strategies based on priority of criteria we...
Decision makers often perform pavements repairs without considering the maintenance priority and wit...
The application of Analytic Hierarchy Process (AHP) method for the prioritization of pavement mainte...
– Preservation of the reconstruction of a national road in Indonesia, has become full attention by t...
The road network tends to decrease the conditions indicated by the occurrence of damage to the road....
<p><strong>Abstrac</strong> :Road handling priority determination is an important tasks faced by dec...
In the current economic climate, budgets for the maintenance of public buildings are unlikely to mee...
Maintenance activities and pavement rehabilitation require the allocation of massive finances. Yet d...
Determination of road maintenance involves complex multi-criteria in decision making process. Analyt...
Determination of road maintenance involves complex multi-criteria in decision making process. Analyt...
The quality of roads as public goods should be maintained and improved time to time. In order to put...
Decision-making processes require the selection of appropriate and choose the optimal solution for i...
Salem is the fifth largest city with a population of 7.54 lakhs (2011) in Tamil Nadu. Local Authorit...
The Analytic Hierarchy Process (AHP) method has been employed in a previous study to determine Bali ...
Graduation date: 2005The prioritization of road maintenance projects is an important forest engineer...