Illinois at Urbana-Champaign The Tunnel and Reservoir Plan (TARP) was adopted by the Metropolitan Sanitary District of Greater Chicago in 1972 to address combined sewer overflow (CSO) pollution and flooding problems in 970 km2 of the Chicago metropolitan area served by combined sewers. TARP consists of about 175 km of tunnels, three reservoirs, 256 drop shafts, and over 600 connecting structures, pumping stations, and other appurtenances for the capture and storage of CSOs and for conveying the stored CSOs to water reclamation plants for treatment. The TARP system i
Abstract: Plans were developed for optimal use of available groundwater and surface water re-sources...
"Prepared for the U.S. Army Corps of Engineers, Rock Island District and the Illinois Department of ...
The tunnel system for the Combined Sewer Overflow .Abatement Project (CSOAP) for the City of Roches...
The Tunnel and Reservoir Plan (TARP) was adopted by the Metropolitan Sanitary District of Greater Ch...
Under the agreement of November 1, 1986, between the Metropolitan Sanitary District of Greater Chic...
The O'Hare System of the Tunnel and Reservoir Plan (TARP), which services 11.2 square miles of comb...
The Mainstream System excluding North Branch and the Calumet System excluding Indiana A venue tunne...
The Lawrence Avenue Underflow Sewer System is a small deep tunnel system located in the Northwest pa...
Urban flooding is generally expected in cities where the urban development increases the impervious ...
This study was performed to investigate the reduction in flood peaks and im-provement in water quali...
Numerical studies of hydraulic transients for the Phase I Mainstream system of the Tunnel and Reser...
Numerical studies of hydraulic transients for the TARP Phase I system were conducted in 1988. and 1...
"B-166506"--Prelim. p."CED-79-77.""May 15, 1979."Cover title.v. 1. An executive summary -- v. 2. The...
Metropolitan Water Reclamation District of Greater Chicago and U.S. Army Corps of Engineers (Chicago...
At head of title: "State of Illinois.""Issued by Department of Registration and Education, State Wat...
Abstract: Plans were developed for optimal use of available groundwater and surface water re-sources...
"Prepared for the U.S. Army Corps of Engineers, Rock Island District and the Illinois Department of ...
The tunnel system for the Combined Sewer Overflow .Abatement Project (CSOAP) for the City of Roches...
The Tunnel and Reservoir Plan (TARP) was adopted by the Metropolitan Sanitary District of Greater Ch...
Under the agreement of November 1, 1986, between the Metropolitan Sanitary District of Greater Chic...
The O'Hare System of the Tunnel and Reservoir Plan (TARP), which services 11.2 square miles of comb...
The Mainstream System excluding North Branch and the Calumet System excluding Indiana A venue tunne...
The Lawrence Avenue Underflow Sewer System is a small deep tunnel system located in the Northwest pa...
Urban flooding is generally expected in cities where the urban development increases the impervious ...
This study was performed to investigate the reduction in flood peaks and im-provement in water quali...
Numerical studies of hydraulic transients for the Phase I Mainstream system of the Tunnel and Reser...
Numerical studies of hydraulic transients for the TARP Phase I system were conducted in 1988. and 1...
"B-166506"--Prelim. p."CED-79-77.""May 15, 1979."Cover title.v. 1. An executive summary -- v. 2. The...
Metropolitan Water Reclamation District of Greater Chicago and U.S. Army Corps of Engineers (Chicago...
At head of title: "State of Illinois.""Issued by Department of Registration and Education, State Wat...
Abstract: Plans were developed for optimal use of available groundwater and surface water re-sources...
"Prepared for the U.S. Army Corps of Engineers, Rock Island District and the Illinois Department of ...
The tunnel system for the Combined Sewer Overflow .Abatement Project (CSOAP) for the City of Roches...