The traditional PERT (Program Evaluation and Review Technique) model uses beta distribution as the distribution of activity duration and estimates the mean and the variance of activity duration using “pessimistic”, “most likely ” and “optimistic ” time estimates proposed by an expert. In the past several authors have modified the original PERT estimators to improve the accuracy. In this paper, on the basis of the study of the PERT assumptions, we present an improvement of these estimates. At the end of the paper, an example is presented to compare with those obtained using the proposed method as well as other method. The comparisons reveal that the method proposed in this paper is more effective in determining the activity criticalities and...
This short video briefly overviews the project evaluation and review technique (PERT). In particu...
AbstractThe original PERT technique assumes β distribution for the activity durations. The developme...
The PERT-based method for estimation of project implementation time, which uses Rayleigh distributio...
This paper builds upon earlier work from the decision/risk analysis area in presenting simple, easy-...
In order to validate the assumption of beta distributed activity durations in the PERT algorithm, a ...
A maximum entropy approach leads to a truncated normal distribution for the activity time in PERT an...
The Weibull probability distribution can be used as an alternative model for task time estimates in ...
Most studies of project time estimation assume that (a) activity times are mutually independent rand...
Estimation of task and project completion times within IT projects remains one of the most error-pro...
The two standard steps for estimating PERT times are: Step 1, estimate a, in, and b; and Step 2, use...
The Program Evaluation and Review Technique (PERT) model uses parameters such as the specified proje...
International audienceIn project or production management, an activity network is classically define...
this paper. The project starts at the initial node and ends at the terminal node. A path is a set of...
Program Evaluation and Review Technique (PERT) is widely used for project management in real world a...
The critical path method (CPM), project evaluation and review technique (PERT), and stochastic PERT,...
This short video briefly overviews the project evaluation and review technique (PERT). In particu...
AbstractThe original PERT technique assumes β distribution for the activity durations. The developme...
The PERT-based method for estimation of project implementation time, which uses Rayleigh distributio...
This paper builds upon earlier work from the decision/risk analysis area in presenting simple, easy-...
In order to validate the assumption of beta distributed activity durations in the PERT algorithm, a ...
A maximum entropy approach leads to a truncated normal distribution for the activity time in PERT an...
The Weibull probability distribution can be used as an alternative model for task time estimates in ...
Most studies of project time estimation assume that (a) activity times are mutually independent rand...
Estimation of task and project completion times within IT projects remains one of the most error-pro...
The two standard steps for estimating PERT times are: Step 1, estimate a, in, and b; and Step 2, use...
The Program Evaluation and Review Technique (PERT) model uses parameters such as the specified proje...
International audienceIn project or production management, an activity network is classically define...
this paper. The project starts at the initial node and ends at the terminal node. A path is a set of...
Program Evaluation and Review Technique (PERT) is widely used for project management in real world a...
The critical path method (CPM), project evaluation and review technique (PERT), and stochastic PERT,...
This short video briefly overviews the project evaluation and review technique (PERT). In particu...
AbstractThe original PERT technique assumes β distribution for the activity durations. The developme...
The PERT-based method for estimation of project implementation time, which uses Rayleigh distributio...