Computer program for determining manpower costs for full time, part time, and contractor personnel is discussed. Twelve different tables resulting from computer output are described. Program is written in FORTRAN 4 for IBM 360/65 computer
Information necessary to use the LOVES computer program in its existing state or to modify the progr...
The characteristics of a computer based data system for handling human factors task information gene...
The application of the NASTRAN program to solve civilian structural engineering problems is reported...
Several computer programs which are available through the NASA Technology Utilization Program are ou...
Computer program identifies the uses of all facilities and provides information on the net area in e...
The purpose was to study how manpower and projects are planned at the Facilities Engineering Divisio...
There were two major sections of the project for the Office of Human Resources (OHR). The first sect...
Users manual on FORTRAN 4 COMPUTE program for IBM 360/67 time sharing systemPrepared by Lewis Resear...
A computer method measures the users performance in cost-type contracts utilizing the existing nasa ...
Computer programs are reported of technological developments in: management techniques, measurements...
KOPE /Kalendar Oriented Program Efforts/ is a computer program that establishes control over project...
A study is performed on the economic tradeoffs of humans and machines in space activities, including...
Computer programs, routines, and subroutines for aiding engineers, scientists, and mathematicians in...
The ADP (Automated Data Processing) Analysis Project was conducted for the Human Resources Managemen...
A manpower/cost estimation model is developed which is based on a detailed level of financial analys...
Information necessary to use the LOVES computer program in its existing state or to modify the progr...
The characteristics of a computer based data system for handling human factors task information gene...
The application of the NASTRAN program to solve civilian structural engineering problems is reported...
Several computer programs which are available through the NASA Technology Utilization Program are ou...
Computer program identifies the uses of all facilities and provides information on the net area in e...
The purpose was to study how manpower and projects are planned at the Facilities Engineering Divisio...
There were two major sections of the project for the Office of Human Resources (OHR). The first sect...
Users manual on FORTRAN 4 COMPUTE program for IBM 360/67 time sharing systemPrepared by Lewis Resear...
A computer method measures the users performance in cost-type contracts utilizing the existing nasa ...
Computer programs are reported of technological developments in: management techniques, measurements...
KOPE /Kalendar Oriented Program Efforts/ is a computer program that establishes control over project...
A study is performed on the economic tradeoffs of humans and machines in space activities, including...
Computer programs, routines, and subroutines for aiding engineers, scientists, and mathematicians in...
The ADP (Automated Data Processing) Analysis Project was conducted for the Human Resources Managemen...
A manpower/cost estimation model is developed which is based on a detailed level of financial analys...
Information necessary to use the LOVES computer program in its existing state or to modify the progr...
The characteristics of a computer based data system for handling human factors task information gene...
The application of the NASTRAN program to solve civilian structural engineering problems is reported...