Concrete sawing operations are performed at pre-determined locations within the first 24 hours to prevent random cracking on jointed plain concrete pavements. In current construction procedures, the depth and the timing of the saw is usually established by the contractor based on experience. The objective of this study was to analyze the effect of several concrete mixture proportions and constituents on the early-age fracture properties and their effect on saw cut timing and depth for concrete pavements with several slab geometries. Concrete pavement mixtures with different coarse aggregate size and cementitious content were evaluated to determine the sensitivity of the measured fracture properties on saw cut model predictions. Finite eleme...
The objectives of this research were to provide the Illinois Department of Transportation (IDOT) wit...
Proper storage practices are critical to protect materials from intermingling, contamination, or d...
794179905Technical summary.PDFTech ReportSPR-3200Joints (Engineering)ConcretePavementsPortland cemen...
Joints are placed in Portland cement concrete pavements (PCCP) to control random cracking. These joi...
Early-entry sawing is an attractive operation to expedite the construction of jointed concrete pavem...
US Transportation Collection2018PDFTech ReportCrovetti, James A.Kevern, John T.Marquette University....
2007PDFTech Reporthttps://www.fhwa.dot.gov/pavement/concrete/pubs/07031/07031.pdfhttps://www.fhwa.do...
Early entry sawing applies sawing earlier and more shallowly than conventional sawing and is believe...
Currently in concrete pavements, a single concrete mixture design and structural surface layer are s...
This 2-page fact sheet provides information about a new approach that would increase accuracy in det...
Early entry sawing applies sawing earlier and more shallowly than conventional sawing and is believe...
The typical slab dimensions for a concrete pavement are 12 ft wide by 15ft long with slab thicknesse...
183 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2009.The increasing service demand...
PDFTech ReportFHWA-ICT-11-076ICT-11-076UILU-ENG-2011-2001ICT R27-63Rigid pavementsSawingCuttingContr...
129 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2005.In many concrete structures e...
The objectives of this research were to provide the Illinois Department of Transportation (IDOT) wit...
Proper storage practices are critical to protect materials from intermingling, contamination, or d...
794179905Technical summary.PDFTech ReportSPR-3200Joints (Engineering)ConcretePavementsPortland cemen...
Joints are placed in Portland cement concrete pavements (PCCP) to control random cracking. These joi...
Early-entry sawing is an attractive operation to expedite the construction of jointed concrete pavem...
US Transportation Collection2018PDFTech ReportCrovetti, James A.Kevern, John T.Marquette University....
2007PDFTech Reporthttps://www.fhwa.dot.gov/pavement/concrete/pubs/07031/07031.pdfhttps://www.fhwa.do...
Early entry sawing applies sawing earlier and more shallowly than conventional sawing and is believe...
Currently in concrete pavements, a single concrete mixture design and structural surface layer are s...
This 2-page fact sheet provides information about a new approach that would increase accuracy in det...
Early entry sawing applies sawing earlier and more shallowly than conventional sawing and is believe...
The typical slab dimensions for a concrete pavement are 12 ft wide by 15ft long with slab thicknesse...
183 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2009.The increasing service demand...
PDFTech ReportFHWA-ICT-11-076ICT-11-076UILU-ENG-2011-2001ICT R27-63Rigid pavementsSawingCuttingContr...
129 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2005.In many concrete structures e...
The objectives of this research were to provide the Illinois Department of Transportation (IDOT) wit...
Proper storage practices are critical to protect materials from intermingling, contamination, or d...
794179905Technical summary.PDFTech ReportSPR-3200Joints (Engineering)ConcretePavementsPortland cemen...