This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed: 1. SAR posted for comment (April 20–May 21, 2007). 2. Revised SAR and response to comments posted. 3. Revised SAR and response to comments approved by SC (June 14, 2007). 4. SDT appointed on (August 18, 2007). 5. Posted first draft of standard for a 30 day comment period June 15 –July 15, 2011 6. Draft 2 of PRC-019-1 was posted for a 45 day concurrent comment and ballot perio
This section is maintained by the drafting team during the development of the standard and will be r...
113) Document Type: F43.02 (14) Keywords (Description/Topical Codes): degraded voltage relay, setpoi...
URN 01/603Available from British Library Document Supply Centre-DSC:m01/14257 / BLDSC - British Libr...
This section is maintained by the drafting team during the development of the standard and will be r...
This section is maintained by the drafting team during the development of the standard and will be r...
This section is maintained by the drafting team during the development of the standard and will be r...
This section is maintained by the drafting team during the development of the standard and will be r...
This section is maintained by the drafting team during the development of the standard and will be r...
In light of the adoption of a revised “Bulk Electric System ” definition by the Board of Trustees, c...
This section is maintained by the drafting team during the development of the standard and will be r...
In light of the adoption of a revised “Bulk Electric System ” definition by the Board of Trustees, c...
This section is maintained by the drafting team during the development of the standard and will be r...
Approved By: Alan M. DeSimone, 9/25/2009 Name/Date EH&S Concurrence By: Alan M. DeSimone, 9/25/2...
The descriptive information, analyses, and referenced documents, including electrical single line di...
The Disturbance Monitoring Drafting Team thanks all commenters who submitted comments on the SAR. Th...
This section is maintained by the drafting team during the development of the standard and will be r...
113) Document Type: F43.02 (14) Keywords (Description/Topical Codes): degraded voltage relay, setpoi...
URN 01/603Available from British Library Document Supply Centre-DSC:m01/14257 / BLDSC - British Libr...
This section is maintained by the drafting team during the development of the standard and will be r...
This section is maintained by the drafting team during the development of the standard and will be r...
This section is maintained by the drafting team during the development of the standard and will be r...
This section is maintained by the drafting team during the development of the standard and will be r...
This section is maintained by the drafting team during the development of the standard and will be r...
In light of the adoption of a revised “Bulk Electric System ” definition by the Board of Trustees, c...
This section is maintained by the drafting team during the development of the standard and will be r...
In light of the adoption of a revised “Bulk Electric System ” definition by the Board of Trustees, c...
This section is maintained by the drafting team during the development of the standard and will be r...
Approved By: Alan M. DeSimone, 9/25/2009 Name/Date EH&S Concurrence By: Alan M. DeSimone, 9/25/2...
The descriptive information, analyses, and referenced documents, including electrical single line di...
The Disturbance Monitoring Drafting Team thanks all commenters who submitted comments on the SAR. Th...
This section is maintained by the drafting team during the development of the standard and will be r...
113) Document Type: F43.02 (14) Keywords (Description/Topical Codes): degraded voltage relay, setpoi...
URN 01/603Available from British Library Document Supply Centre-DSC:m01/14257 / BLDSC - British Libr...