A control system for a 150 MeV FFAG accelerator com-plex in KURRI has been developed and served for actual commissioning of this accelerator complex with high relia-bility. This control system has been developed using simple and versatile tools such as PLCs, LabVIEW for MMI/DAQ systems, MySQL and Apache, and this can be a good ex-ample for small institutes without specialists on accelerator control. The design and development of our control system are reviewed from the perspective of developers without specialized experience on accelerator control. Also, the current status and applications of this control system are introduced
The concepts of light-energy accelerator control are described. Some hard- and software requirements...
International audienceThe goal of the MYRRHA project is to demonstrate the technical feasibility of ...
International audienceThe goal of the MYRRHA project is to demonstrate the technical feasibility of ...
A simple, convenient control system has been devel-oped for a 150 MeV proton FFAG accelerator comple...
It is important to record parameters of an accelerator sequentially all through the operations not o...
In the commissioning of KEKB 8GeV / 3.5GeV linac the accelerator control system was much impr...
In the commissioning of KEKB e 8GeV / e+ 3.5GeV linac the accelerator control system was much impro...
The control system of the Ion Beam Laboratory Berlin ISL Berlin dates from the late 1970 s and was...
The thesis presents the implementation of a control system for particle accelerator in the LabVIEW d...
For basic research experiments of accelerator driven subcritical reactor (ADSR) system, an 150 MeV F...
A well-conceived plan of attack is essential to the task of designing a control system for a large a...
Implementation of a high performance computer control system tailored to the requirements of the Sup...
Over the past 18 months on the GTA project at Los Alamos, we have been developing tools for building...
A new mid-infrared FEL has been commissioned at the Fritz-Haber-Institut (FHI) in Berlin. It will be...
The concepts of light-energy accelerator control are described. Some hard- and software requirements...
The concepts of light-energy accelerator control are described. Some hard- and software requirements...
International audienceThe goal of the MYRRHA project is to demonstrate the technical feasibility of ...
International audienceThe goal of the MYRRHA project is to demonstrate the technical feasibility of ...
A simple, convenient control system has been devel-oped for a 150 MeV proton FFAG accelerator comple...
It is important to record parameters of an accelerator sequentially all through the operations not o...
In the commissioning of KEKB 8GeV / 3.5GeV linac the accelerator control system was much impr...
In the commissioning of KEKB e 8GeV / e+ 3.5GeV linac the accelerator control system was much impro...
The control system of the Ion Beam Laboratory Berlin ISL Berlin dates from the late 1970 s and was...
The thesis presents the implementation of a control system for particle accelerator in the LabVIEW d...
For basic research experiments of accelerator driven subcritical reactor (ADSR) system, an 150 MeV F...
A well-conceived plan of attack is essential to the task of designing a control system for a large a...
Implementation of a high performance computer control system tailored to the requirements of the Sup...
Over the past 18 months on the GTA project at Los Alamos, we have been developing tools for building...
A new mid-infrared FEL has been commissioned at the Fritz-Haber-Institut (FHI) in Berlin. It will be...
The concepts of light-energy accelerator control are described. Some hard- and software requirements...
The concepts of light-energy accelerator control are described. Some hard- and software requirements...
International audienceThe goal of the MYRRHA project is to demonstrate the technical feasibility of ...
International audienceThe goal of the MYRRHA project is to demonstrate the technical feasibility of ...