At the research center in Karlsruhe, FZK, the new 2.5 GeV synchrotron radiation light source ANKA is under construction which is dedicated to the LIGA technique. The 500 MHz RF system consists of two 250 kW klystrons, the waveguide system, four ELETTRA cavities and the low level electronics. Each klystron is feeding two cavities.
A 12 GHz 50MW X-band klystron is under development at the SLAC National Accelerator Laboratory Klyst...
A prototype rf power source based on the Relativistic Klystron Two-Beam Accelerator (RK-TBA) concept...
The technical challenge for making two-beam accelerators into realizable power sources for high-ener...
ANKA, a 2.5 GeV synchrotron light source will be built within the next three years at the Research C...
ANKA, a 2.5 GeV light source will be built at the Research Center Karlsruhe, Germany. This source is...
For the storage ring of the synchrotron light source ANKA, under construction at FZK Karlsruhe, Germ...
ANKA, a 2.5 GeV storage ring for synchrotron radiation in Karlsruhe, delivers beam to ten bending ma...
The electron storage ring at ANKA is designed as a variation of an eightfold DBA structure. Since it...
After a first successful test of a superconducting cold bore undulator in the synchrotron light sour...
l-l Oho,Tsukuba-shi,Ibaraki-ken,305,Japan A high duty UHF(432-MHz) RF source for the intense proton ...
l-l Oho,Tsukuba-shi,Ibaraki-ken,305,Japan A high duty UHF(432-MHz) RF source for the intense proton ...
The MAX IV synchrotron radiation facility is currently being constructed in Lund, Sweden. It consist...
A 2 GeV synchrotron light source project is in progress in Pohang, Korea. The light source is design...
It is well established that operating frequencies in the 30-GHz range and higher are required to obt...
This paper describes an X-Band and RF system for the Next Linear Collider Test Accelerator. The RF s...
A 12 GHz 50MW X-band klystron is under development at the SLAC National Accelerator Laboratory Klyst...
A prototype rf power source based on the Relativistic Klystron Two-Beam Accelerator (RK-TBA) concept...
The technical challenge for making two-beam accelerators into realizable power sources for high-ener...
ANKA, a 2.5 GeV synchrotron light source will be built within the next three years at the Research C...
ANKA, a 2.5 GeV light source will be built at the Research Center Karlsruhe, Germany. This source is...
For the storage ring of the synchrotron light source ANKA, under construction at FZK Karlsruhe, Germ...
ANKA, a 2.5 GeV storage ring for synchrotron radiation in Karlsruhe, delivers beam to ten bending ma...
The electron storage ring at ANKA is designed as a variation of an eightfold DBA structure. Since it...
After a first successful test of a superconducting cold bore undulator in the synchrotron light sour...
l-l Oho,Tsukuba-shi,Ibaraki-ken,305,Japan A high duty UHF(432-MHz) RF source for the intense proton ...
l-l Oho,Tsukuba-shi,Ibaraki-ken,305,Japan A high duty UHF(432-MHz) RF source for the intense proton ...
The MAX IV synchrotron radiation facility is currently being constructed in Lund, Sweden. It consist...
A 2 GeV synchrotron light source project is in progress in Pohang, Korea. The light source is design...
It is well established that operating frequencies in the 30-GHz range and higher are required to obt...
This paper describes an X-Band and RF system for the Next Linear Collider Test Accelerator. The RF s...
A 12 GHz 50MW X-band klystron is under development at the SLAC National Accelerator Laboratory Klyst...
A prototype rf power source based on the Relativistic Klystron Two-Beam Accelerator (RK-TBA) concept...
The technical challenge for making two-beam accelerators into realizable power sources for high-ener...