This p t ^ r describes a simfdie algorithm for the solution of very large sequence probiems witlutut the use of a computer. It produces approximate solutions to the n job, m madune sequencing problem where no passing is considered and the criterion is mjnimnin total elapsed time. Up to m-1 sequence may be found. Introductitm The search for a soluticm to the problem of finding an optimal or near optimal se-quence of jobs bdng osheduled in a flow shop type situation has given consideration to both exact and {^proximate techniques of solution. Exact techniques, which uraially require an dectzonic computer, have been developed to minimize some well criterion on problems involving a limited number of jobs [2,5,6,10]. [9] has pointed out that the...
Sequencing and scheduling as a research area is motivated by questions that arise in production plan...
Sequencing and scheduling as a research area is motivated by questions that arise in production plan...
Sequencing and scheduling as a research area is motivated by questions that arise in production plan...
There is a need, in industry, for an efficient method of determining an optimal sequence for process...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
In a general flow-shop situation, where all the jobs must pass through all the machines in the same ...
77 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1980.This thesis addresses the prob...
job processing time, flow shop scheduling problem Dr. P. V. Ubale Associate professor in Statistics,...
The problem of sequencing jobs on a weaving machine is considered where set-up costs are included. T...
The problem of sequencing jobs on a weaving machine is considered where set-up costs are included. T...
The problem of sequencing jobs on a weaving machine is considered where set-up costs are included. T...
N jobs simultaneously arrive at a machine where they are to be processed. It is assumed that the pro...
AbstractIn this paper a Heuristic Robust Algorithm has been proposed to solve the sequencing of jobs...
We present a greedy heuristic for the n job/1 machine scheduling problem with precedence constraints...
Abstract—Classical methods like johnson method can only be applied to find optimum job sequence for ...
Sequencing and scheduling as a research area is motivated by questions that arise in production plan...
Sequencing and scheduling as a research area is motivated by questions that arise in production plan...
Sequencing and scheduling as a research area is motivated by questions that arise in production plan...
There is a need, in industry, for an efficient method of determining an optimal sequence for process...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
In a general flow-shop situation, where all the jobs must pass through all the machines in the same ...
77 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1980.This thesis addresses the prob...
job processing time, flow shop scheduling problem Dr. P. V. Ubale Associate professor in Statistics,...
The problem of sequencing jobs on a weaving machine is considered where set-up costs are included. T...
The problem of sequencing jobs on a weaving machine is considered where set-up costs are included. T...
The problem of sequencing jobs on a weaving machine is considered where set-up costs are included. T...
N jobs simultaneously arrive at a machine where they are to be processed. It is assumed that the pro...
AbstractIn this paper a Heuristic Robust Algorithm has been proposed to solve the sequencing of jobs...
We present a greedy heuristic for the n job/1 machine scheduling problem with precedence constraints...
Abstract—Classical methods like johnson method can only be applied to find optimum job sequence for ...
Sequencing and scheduling as a research area is motivated by questions that arise in production plan...
Sequencing and scheduling as a research area is motivated by questions that arise in production plan...
Sequencing and scheduling as a research area is motivated by questions that arise in production plan...