During the winter 1995/96 shutdown the e- and p-rings of the HERA collider at DESY were modified to accommo-date a new B-physics experiment, HERA-B [1]. When data taking with the complete detector starts in early 1998, HERA-B will be the fourth HERA physics detector and will occupy the HERA west hall. The HERA-B detec-tor will use interactions of beam halo protons with internal wire targets and presents a wide variety of accelerator de-sign challenges. Before modification, the west hall and straight section were occupied solely by accelerator components (injection, abort, collimation, rf and beam diagnostic systems) and a major rearrangement and rebuilding of existing accelerator systems was required to accommodate HERA-B. Achiev
The HERA-B Vertex Detector System (VDS) is a Roman Pot system integrated into the proton ring of the...
The HERA electron--proton collider has collected 100 pb$^{-1}$ of data since its start-up in 1992, a...
After a description of a proposal for using the HERA facility as B factory by means of an internal t...
The HERA electron-proton collider at Hamburg Germany, designed for collisions of 820 GeV protons wit...
During a shut down period of 9 months starting September 2000 two interaction regions of HERA will b...
The HERA-B experiment is being built to measure CP violation in the B-system using internal targets ...
HERA-B has had a number of successes in recent weeks - all three spin rotator pairs have been put in...
The HERA electron-proton collider at Hamburg Germany, designed for collisions of 820 GeV protons wit...
DESY pursues a luminosity upgrade project [1] for the HERA electron proton collider with the goal to...
The HERA-B experiment is designed for studying aspects of B-physics at DESY's HERA proton-electron s...
The HERA project (HERA 1981, Wiik 1982, 1992, Voss 1988) was approved in 1984. Operation of HERA for...
The HERA accelerator study periods during 2000 were mainly concerned with issues of the luminosity u...
The HERA electron--proton collider has collected 100 pb$^{-1}$ of data since its start-up in 1992, a...
The HERA electron--proton collider has collected 100 pb$^{-1}$ of data since its start-up in 1992, a...
The HERA electron--proton collider has collected 100 pb$^{-1}$ of data since its start-up in 1992, a...
The HERA-B Vertex Detector System (VDS) is a Roman Pot system integrated into the proton ring of the...
The HERA electron--proton collider has collected 100 pb$^{-1}$ of data since its start-up in 1992, a...
After a description of a proposal for using the HERA facility as B factory by means of an internal t...
The HERA electron-proton collider at Hamburg Germany, designed for collisions of 820 GeV protons wit...
During a shut down period of 9 months starting September 2000 two interaction regions of HERA will b...
The HERA-B experiment is being built to measure CP violation in the B-system using internal targets ...
HERA-B has had a number of successes in recent weeks - all three spin rotator pairs have been put in...
The HERA electron-proton collider at Hamburg Germany, designed for collisions of 820 GeV protons wit...
DESY pursues a luminosity upgrade project [1] for the HERA electron proton collider with the goal to...
The HERA-B experiment is designed for studying aspects of B-physics at DESY's HERA proton-electron s...
The HERA project (HERA 1981, Wiik 1982, 1992, Voss 1988) was approved in 1984. Operation of HERA for...
The HERA accelerator study periods during 2000 were mainly concerned with issues of the luminosity u...
The HERA electron--proton collider has collected 100 pb$^{-1}$ of data since its start-up in 1992, a...
The HERA electron--proton collider has collected 100 pb$^{-1}$ of data since its start-up in 1992, a...
The HERA electron--proton collider has collected 100 pb$^{-1}$ of data since its start-up in 1992, a...
The HERA-B Vertex Detector System (VDS) is a Roman Pot system integrated into the proton ring of the...
The HERA electron--proton collider has collected 100 pb$^{-1}$ of data since its start-up in 1992, a...
After a description of a proposal for using the HERA facility as B factory by means of an internal t...