A fast extraction kicker system has been installed in the SPS and successfully used in extraction tests in 2003. It will serve to send beam to the anticlockwise LHC ring and the CNGS neutrino facility. The magnets and pulse generators have been recuperated from an earlier installation and upgraded to fit the present application. Hardware improvements include diode stacks as replacement of the previous dump thyratron switches, a cooling system of the magnets, sensors for its ferrite temperatures and magnetic field quality assessment. In preparation of the future use for 450 GeV/c transfer to LHC and double batch extraction at 400 GeV/c for CNGS the tests comprised extractions of single bunches, twelve bunches in a single extraction and singl...
The proton and lead ion beams for the anti-clockwise ring of the LHC will be extracted from the SPS ...
The SNS extraction fast kicker system is a very high power, high repetition rate pulsed power system...
The kicker magnets are installed in the vacuum chamber at the extraction section of the RCS (Rapid C...
A fast extraction kicker system has been installed in the SPS and successfully used in extraction te...
The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the long ...
A new fast extraction has been set up in SPS LSS6 to transfer 450 GeV/c protons as well as ions to R...
The extraction kickers of the Super Proton Synchrotron (SPS) need to be upgraded to meet the Large H...
A fast extraction system, located in the LSS6 region of the CERN SPS accelerator, transfers 450 GeV/...
A five-turn continuous extraction has up to now been used to transfer the proton beam from the CERN ...
The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the CERN ...
The SNS accumulator ring extraction fast-kicker system was design, developed, and prototype tested a...
The present SPS injection kicker system is composed of 12 travelling wave magnets connected in pairs...
The CERN Super Proton Synchrotron has to fulfil the demanding intensity specifications for the High ...
Installation of the kicker magnets in the extraction section of the rapid cycling synchrotron in the...
The proton and lead ion beams for the anti-clockwise ring of the LHC will be extracted from the SPS...
The proton and lead ion beams for the anti-clockwise ring of the LHC will be extracted from the SPS ...
The SNS extraction fast kicker system is a very high power, high repetition rate pulsed power system...
The kicker magnets are installed in the vacuum chamber at the extraction section of the RCS (Rapid C...
A fast extraction kicker system has been installed in the SPS and successfully used in extraction te...
The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the long ...
A new fast extraction has been set up in SPS LSS6 to transfer 450 GeV/c protons as well as ions to R...
The extraction kickers of the Super Proton Synchrotron (SPS) need to be upgraded to meet the Large H...
A fast extraction system, located in the LSS6 region of the CERN SPS accelerator, transfers 450 GeV/...
A five-turn continuous extraction has up to now been used to transfer the proton beam from the CERN ...
The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the CERN ...
The SNS accumulator ring extraction fast-kicker system was design, developed, and prototype tested a...
The present SPS injection kicker system is composed of 12 travelling wave magnets connected in pairs...
The CERN Super Proton Synchrotron has to fulfil the demanding intensity specifications for the High ...
Installation of the kicker magnets in the extraction section of the rapid cycling synchrotron in the...
The proton and lead ion beams for the anti-clockwise ring of the LHC will be extracted from the SPS...
The proton and lead ion beams for the anti-clockwise ring of the LHC will be extracted from the SPS ...
The SNS extraction fast kicker system is a very high power, high repetition rate pulsed power system...
The kicker magnets are installed in the vacuum chamber at the extraction section of the RCS (Rapid C...