PEP-II is an e+e- asymmetric B-Factory Collider located at SLAC operating at the Upsilon 4S resonance (3.1 GeV x 9 GeV). It has reached a luminosity of 1.09x1034/cm2/s and has delivered an integrated luminosity of 884 pb-1 in one day. PEP-II has delivered, over the past seven years, an integrated luminosity to the BaBar detector of over 375 fb-1. PEP-II operates in continuous injection mode for both beams boosting the integrated luminosity. The peak positron current has reached 2.995 A in 1722 bunches. The electron current has reached 1.78 A. The goal over the next several years is to reach a luminosity of 2.1x1034/cm2/s. The accelerator physics issues being addressed in PEP-II to reach this goal include the electron cloud instability, beam...
PEP-II, a 9 GeV {times} 3.1 GeV electron-positron collider with a design luminosity of 3 {times} 10{...
The present B-factories PEP-II and KEKB have reached luminosities of 3-4x1033/cm2/s and delivered in...
The PEP-II B Factory at SLAC has been in operation with the BABAR detector since the summer of 1999....
PEP-II is an e{sup +}e{sup -} asymmetric B-Factory Collider located at SLAC operating at the Upsilon...
PEP-II is an e+e- B-Factory Collider located at SLAC operating at the Upsilon 4S resonance (3.1 GeV ...
PEP-II is an e+e- B-Factory Collider located at SLAC operating at the Upsilon 4S resonance (3.1 GeV ...
PEP-II is an e+e- asymmetric B-Factory Collider located at SLAC operating at the Upsilon 4S resonanc...
PEP-II is an asymmetric e+e- collider1,2 being constructed in the SLAC PEP tunnel by SLAC, LBNL, and...
PEP-II is a two-ring asymmetric B factory operating at the Upsilon(4S) resonance. It was constructed...
PEP-II is a two-ring asymmetric B factory operating at the Upsilon(4S) resonance. It was constructe...
The PEP-II B-Factory at SLAC has reached a luminosity of 4.6x1033/cm2/s and has delivered 94 fb-1 of...
The PEP-II B-Factory at SLAC has reached a luminosity of 4.6x1033/cm2/s and has delivered 94 fb-1 of...
The PEP-II e+e-collider has been operating for two years with the BaBar detector at the energy of th...
PEP-II is an asymmetric e+-e − collider operating at the ϒ(4S) energy and has recently set several p...
PEP-II [1-9] is an e+e- collider with asymmetric energies (3.1 and 9 GeV, respectively) in a 2200 m ...
PEP-II, a 9 GeV {times} 3.1 GeV electron-positron collider with a design luminosity of 3 {times} 10{...
The present B-factories PEP-II and KEKB have reached luminosities of 3-4x1033/cm2/s and delivered in...
The PEP-II B Factory at SLAC has been in operation with the BABAR detector since the summer of 1999....
PEP-II is an e{sup +}e{sup -} asymmetric B-Factory Collider located at SLAC operating at the Upsilon...
PEP-II is an e+e- B-Factory Collider located at SLAC operating at the Upsilon 4S resonance (3.1 GeV ...
PEP-II is an e+e- B-Factory Collider located at SLAC operating at the Upsilon 4S resonance (3.1 GeV ...
PEP-II is an e+e- asymmetric B-Factory Collider located at SLAC operating at the Upsilon 4S resonanc...
PEP-II is an asymmetric e+e- collider1,2 being constructed in the SLAC PEP tunnel by SLAC, LBNL, and...
PEP-II is a two-ring asymmetric B factory operating at the Upsilon(4S) resonance. It was constructed...
PEP-II is a two-ring asymmetric B factory operating at the Upsilon(4S) resonance. It was constructe...
The PEP-II B-Factory at SLAC has reached a luminosity of 4.6x1033/cm2/s and has delivered 94 fb-1 of...
The PEP-II B-Factory at SLAC has reached a luminosity of 4.6x1033/cm2/s and has delivered 94 fb-1 of...
The PEP-II e+e-collider has been operating for two years with the BaBar detector at the energy of th...
PEP-II is an asymmetric e+-e − collider operating at the ϒ(4S) energy and has recently set several p...
PEP-II [1-9] is an e+e- collider with asymmetric energies (3.1 and 9 GeV, respectively) in a 2200 m ...
PEP-II, a 9 GeV {times} 3.1 GeV electron-positron collider with a design luminosity of 3 {times} 10{...
The present B-factories PEP-II and KEKB have reached luminosities of 3-4x1033/cm2/s and delivered in...
The PEP-II B Factory at SLAC has been in operation with the BABAR detector since the summer of 1999....