This work discusses the decommissioning plan of GRR-1 reactor old delay tank. The tank inner surface area presents low contamination. In this work the processes and methods that will be used to decontaminate, cut, dismantle, remove and release of the delay tank materials in a safe and organized manner in order to prevent undue radiation exposures to the facility staff, public and the environment according to the ALARA principle are discussed
The decommissioning of radiologically contaminated buildings at Department of Energy (DOE) sites pro...
As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these inst...
The Kiev’s research reactor WWR-M has been in operation for more than 50 years and its further oper...
The purpose of the Old Hydrofracture Facility (OHF) Tanks Contents Removal Project is to remove the ...
The public exposure from spent fuel shipment is very low. In view of this low exposure and the perfe...
The presentation focuses on some of the time-proven and new technologies being used to accomplish ra...
The history of development of the as-low-as-is-reasonably achievable (ALARA) concept and ALARA crite...
For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and ...
As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these inst...
Argonne National Laboratory (ANL) has completed the D&D of the Experimental Boiling Water Reactor (E...
The Compact Sodium-cooled Nuclear Reactor Facility (KNK) was an experimental nuclear power plant of ...
The aging of research reactors worldwide has resulted in a heightened awareness in the international...
This report describes the past procedure in dismantling the reactor block of the FRJ-1 research reac...
Only at N-Reactor is there a means to accommodate radwaste produced during decontamination. The Dres...
The International Atomic Energy Agency (IAEA) is concerning to establish or adopt standards of safet...
The decommissioning of radiologically contaminated buildings at Department of Energy (DOE) sites pro...
As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these inst...
The Kiev’s research reactor WWR-M has been in operation for more than 50 years and its further oper...
The purpose of the Old Hydrofracture Facility (OHF) Tanks Contents Removal Project is to remove the ...
The public exposure from spent fuel shipment is very low. In view of this low exposure and the perfe...
The presentation focuses on some of the time-proven and new technologies being used to accomplish ra...
The history of development of the as-low-as-is-reasonably achievable (ALARA) concept and ALARA crite...
For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and ...
As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these inst...
Argonne National Laboratory (ANL) has completed the D&D of the Experimental Boiling Water Reactor (E...
The Compact Sodium-cooled Nuclear Reactor Facility (KNK) was an experimental nuclear power plant of ...
The aging of research reactors worldwide has resulted in a heightened awareness in the international...
This report describes the past procedure in dismantling the reactor block of the FRJ-1 research reac...
Only at N-Reactor is there a means to accommodate radwaste produced during decontamination. The Dres...
The International Atomic Energy Agency (IAEA) is concerning to establish or adopt standards of safet...
The decommissioning of radiologically contaminated buildings at Department of Energy (DOE) sites pro...
As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these inst...
The Kiev’s research reactor WWR-M has been in operation for more than 50 years and its further oper...