Since alignment tolerances of the focusing quadrupoles and the dipoles at a 3rd generation synchrotron light source like the PETRA III ring are very tight and downtime allowances for survey are low, a concept of pre-aligned magnets on girders has been developed. This presentation focuses on the development efforts of a low-cost girder system with cheap but nevertheless effective alignment mechanics. Some results of girder deformations during transportation of readily assembled and precisely aligned girders are shown. Besides that, achievements in the development of new ultrasonic hardware for the recently developed DESY-HLS are presented. 1
This report presents major projects and activities of the survey and alignment group at DESY during ...
An ambitious seven month shutdown of the existing SPEAR2 synchrotron radiation facility was successf...
DESY has decided to rebuild its 2304 m long accelerator PETRA II into a dedicated light source calle...
PETRA IV can benefit from the fine control of the girders that carry the storage ring elements to ac...
International audienceThe ESRF is proceeding with the design and procurement of its new low emittanc...
The PETRA IV project at DESY (Deutsches Elektronen Synchrotron) aims at upgrading the PETRA III sync...
PETRA IV at DESY: Research and development progress regarding magnets, girders and vibration issue
Synchrotron radiation facilities are very important in different areas of fundamental and applied sc...
The 'loose end' of the girder presents an alignment problem because there is no beam based alignment...
In storage rings of third-generation synchrotron radiation facilities, the positioning tolerances of...
on the Girder Taiwan Photon Source (TPS) project was proposed 3 years ago to build a 3GeV synchrotro...
DESY (Deutsches Elektronen Synchrotron) is currently expanding the PETRA III storage ring X-ray radi...
The PETRA IV project at DESY (Deutsches Elektronen Synchrotron) aims at building a unique synchrotro...
The tolerances for the alignment of the magnets on the girders of the proposed particle accelerator ...
The photon beamline frontend design for the new insertion device (ID) beamlines of the PETRA III ext...
This report presents major projects and activities of the survey and alignment group at DESY during ...
An ambitious seven month shutdown of the existing SPEAR2 synchrotron radiation facility was successf...
DESY has decided to rebuild its 2304 m long accelerator PETRA II into a dedicated light source calle...
PETRA IV can benefit from the fine control of the girders that carry the storage ring elements to ac...
International audienceThe ESRF is proceeding with the design and procurement of its new low emittanc...
The PETRA IV project at DESY (Deutsches Elektronen Synchrotron) aims at upgrading the PETRA III sync...
PETRA IV at DESY: Research and development progress regarding magnets, girders and vibration issue
Synchrotron radiation facilities are very important in different areas of fundamental and applied sc...
The 'loose end' of the girder presents an alignment problem because there is no beam based alignment...
In storage rings of third-generation synchrotron radiation facilities, the positioning tolerances of...
on the Girder Taiwan Photon Source (TPS) project was proposed 3 years ago to build a 3GeV synchrotro...
DESY (Deutsches Elektronen Synchrotron) is currently expanding the PETRA III storage ring X-ray radi...
The PETRA IV project at DESY (Deutsches Elektronen Synchrotron) aims at building a unique synchrotro...
The tolerances for the alignment of the magnets on the girders of the proposed particle accelerator ...
The photon beamline frontend design for the new insertion device (ID) beamlines of the PETRA III ext...
This report presents major projects and activities of the survey and alignment group at DESY during ...
An ambitious seven month shutdown of the existing SPEAR2 synchrotron radiation facility was successf...
DESY has decided to rebuild its 2304 m long accelerator PETRA II into a dedicated light source calle...