iii VDOT is implementing Pontis 3.0 to provide the analytical component of its Bridge Management System (BMS). This system prioritizes bridge maintenance, repair, rehabilitation, and replacement (MRR&R) needs using cost/benefit analysis. The accuracy of this analysis depends on the condition assessment of the structure and the cost data of MRR&R options used in the analysis. For the network-level analysis a BMS provides, the focus is on what work was done to an element rather than how it was done. To standardize the MRR&R actions taken at the network level, commonly recognized (CoRe) elements have been identified and are used in Pontis. For each element, a set of feasible MRR&R actions has been defined. How these actions are...
Life-cycle analyses are used in condition assessment of new and existing bridges, as well as for eva...
The Iowa DOT currently owns and maintains over 4,000 bridges and culverts on the state highway syste...
2004PDFTech ReportFHWA / LA 03/ 377State Project Number: 739-99-0733LTRC Project Number: 02-1STBridg...
44000605Final reportJuly 1998.PDFTech ReportVTRC 99-R4VirginiaVirginia Transportation Research Counc...
224069239Technical assistance rept.PDFTech ReportVTRC 95-TAR10BridgesMaintenance managementVirginiaV...
711686855Final Report; May 2008 - February 2011PDFTech Reporthttp://ntl.bts.gov/lib/36000/36200/3620...
The Minnesota Department of Transportation (Mn/DOT) has used network level results from the Pontis B...
Final report; Dec. 1, 2008-Mar. 31, 2011.PDFTech ReportCDOT-2012-4Bridge constructionBridge engineer...
The Pontis Bridge Management System (BMS) can provide an agency with direct recommendations for brid...
This project investigated the effects of varying two different elements of bridge management strateg...
755926640Final report.PDFTech Reportlowa DOT Project HR-364BridgesMaintenanceData processingManageme...
In recent years there has been a growing concern about the safety of existing bridges. This concern ...
2016Final reportPDFTech ReportBDV30-977-07Bridge management systemsDecision support systemsStandards...
A bridge management system is being developed together with an integrated inspection program. A pilo...
Abstract. The US National Cooperative Highway Research Program is developing, under project 12-51, a...
Life-cycle analyses are used in condition assessment of new and existing bridges, as well as for eva...
The Iowa DOT currently owns and maintains over 4,000 bridges and culverts on the state highway syste...
2004PDFTech ReportFHWA / LA 03/ 377State Project Number: 739-99-0733LTRC Project Number: 02-1STBridg...
44000605Final reportJuly 1998.PDFTech ReportVTRC 99-R4VirginiaVirginia Transportation Research Counc...
224069239Technical assistance rept.PDFTech ReportVTRC 95-TAR10BridgesMaintenance managementVirginiaV...
711686855Final Report; May 2008 - February 2011PDFTech Reporthttp://ntl.bts.gov/lib/36000/36200/3620...
The Minnesota Department of Transportation (Mn/DOT) has used network level results from the Pontis B...
Final report; Dec. 1, 2008-Mar. 31, 2011.PDFTech ReportCDOT-2012-4Bridge constructionBridge engineer...
The Pontis Bridge Management System (BMS) can provide an agency with direct recommendations for brid...
This project investigated the effects of varying two different elements of bridge management strateg...
755926640Final report.PDFTech Reportlowa DOT Project HR-364BridgesMaintenanceData processingManageme...
In recent years there has been a growing concern about the safety of existing bridges. This concern ...
2016Final reportPDFTech ReportBDV30-977-07Bridge management systemsDecision support systemsStandards...
A bridge management system is being developed together with an integrated inspection program. A pilo...
Abstract. The US National Cooperative Highway Research Program is developing, under project 12-51, a...
Life-cycle analyses are used in condition assessment of new and existing bridges, as well as for eva...
The Iowa DOT currently owns and maintains over 4,000 bridges and culverts on the state highway syste...
2004PDFTech ReportFHWA / LA 03/ 377State Project Number: 739-99-0733LTRC Project Number: 02-1STBridg...