DESY is currently working on decreasing the size of the proton beam and of the electron beam in HERA at the col-lider experiments H1 and ZEUS by moving quadrupoles closer to the interaction points and by increasing their strength. To match the smaller proton beam size, the hor-izontal electron emittance has to be decreased by chang-ing the damping partition numbers and/or by an increase in the phase advance per FODO cell. Together with reaching design currents, these measures should increase the lumi-nosity of HERA from the current maximum value of 2 t
After the design luminosity had been exceeded in the electron–proton collider HERA, the interaction ...
HERA, the first proton lepton storage ring ever built, started operation in 1991. With the experienc...
After the luminosity upgrade of the electron proton collider HERA, the proton bunch length will beco...
EPAC 2000, Vienna DESY is currently working on decreasing the size of the proton beam and of the ele...
DESY is currently working on decreasing the size of the proton beam and of the electron beam in HERA...
During a shut down period of 9 months starting September 2000 two interaction regions of HERA will b...
The HERA electron-proton collider at Hamburg Germany, designed for collisions of 820 GeV protons wit...
The HERA accelerator study periods during 2000 were mainly concerned with issues of the luminosity u...
The HERA electron-proton collider at Hamburg Germany, designed for collisions of 820 GeV protons wit...
After the design luminosity has been exceeded in the electron–proton collider HERA, the interaction ...
The Luminosity of the HERA lepton proton collider is limited in part by the bunch length of the prot...
DESY pursues a luminosity upgrade project [1] for the HERA electron proton collider with the goal to...
The HERA luminosity upgrade, scheduled to take place in 2001, presents a major modifica-tion of the ...
The phase space density of the colliding proton and positron beams and the focusing properties of th...
for the HERA Luminosity upgrade group After the design luminosity of the electron-proton collider HE...
After the design luminosity had been exceeded in the electron–proton collider HERA, the interaction ...
HERA, the first proton lepton storage ring ever built, started operation in 1991. With the experienc...
After the luminosity upgrade of the electron proton collider HERA, the proton bunch length will beco...
EPAC 2000, Vienna DESY is currently working on decreasing the size of the proton beam and of the ele...
DESY is currently working on decreasing the size of the proton beam and of the electron beam in HERA...
During a shut down period of 9 months starting September 2000 two interaction regions of HERA will b...
The HERA electron-proton collider at Hamburg Germany, designed for collisions of 820 GeV protons wit...
The HERA accelerator study periods during 2000 were mainly concerned with issues of the luminosity u...
The HERA electron-proton collider at Hamburg Germany, designed for collisions of 820 GeV protons wit...
After the design luminosity has been exceeded in the electron–proton collider HERA, the interaction ...
The Luminosity of the HERA lepton proton collider is limited in part by the bunch length of the prot...
DESY pursues a luminosity upgrade project [1] for the HERA electron proton collider with the goal to...
The HERA luminosity upgrade, scheduled to take place in 2001, presents a major modifica-tion of the ...
The phase space density of the colliding proton and positron beams and the focusing properties of th...
for the HERA Luminosity upgrade group After the design luminosity of the electron-proton collider HE...
After the design luminosity had been exceeded in the electron–proton collider HERA, the interaction ...
HERA, the first proton lepton storage ring ever built, started operation in 1991. With the experienc...
After the luminosity upgrade of the electron proton collider HERA, the proton bunch length will beco...