The two main power converters for the dipoles (D) and quadrupoles (Q) are presented as part of the complex power converter system of the Antiproton Decelerator. The operational requirements and the performance speci-fications for deceleration from 3.5 to 0.1 GeV/c are dis-cussed. The layout and design of the power part, con-sisting of a 12-pulse thyristor rectifier and a switch-mode parallel active filter (AF), and of the precision regulation are described. The alternatives for integrating the AF into the current and voltage regulation loops are outlined. Problems encountered and results of tests are reported.
This report outlines the future program of the BASE antiproton experiment at the Antiproton Decelera...
In the Antiproton Decelerator (AD) Target Area antiprotons are produced by the collisions of 26 GeV/...
The CERN accelerator complex consists of several generations of particle accelerators, with around 5...
The two main power converters for the dipoles (D) and quadrupoles (Q) are presented as part of the c...
The two main power converters for the dipoles (D) and quadrupoles (Q) are presented as part of the c...
(on behalf of the AD team) To continue an important part of the LEAR physics programme, a simplified...
A new decelerating radio frequency quadrupole (RFQD) has been put in operation at CERN. It decelerat...
A novel system for real-time tune measurement during deceleration of a low-intensity particle beam i...
A simplified scheme for the provision of antiprotons at 100 MeV/c based on fast extraction is descri...
This contribution will describe the new orbit system foreseen for the Antiproton Decelerator (AD) lo...
International audienceThe GBAR (Gravitational Behavior of Antihydrogen at Rest) experiment at CERN r...
The RFQD decelerates antiprotons from a momentum of 100 MeV/c (kinetic energy 5.31 MeV) down to a ki...
The CERN Antiproton Decelerator (AD) produces low-energy antiprotons for studies of antimatter. A 26...
The Relativistic Heavy Ion Collider, now in construction at Brookhaven National Laboratory, will use...
Abstract--More than 6DO switch mode power converters are installed in LEP to power the Main Ring Mag...
This report outlines the future program of the BASE antiproton experiment at the Antiproton Decelera...
In the Antiproton Decelerator (AD) Target Area antiprotons are produced by the collisions of 26 GeV/...
The CERN accelerator complex consists of several generations of particle accelerators, with around 5...
The two main power converters for the dipoles (D) and quadrupoles (Q) are presented as part of the c...
The two main power converters for the dipoles (D) and quadrupoles (Q) are presented as part of the c...
(on behalf of the AD team) To continue an important part of the LEAR physics programme, a simplified...
A new decelerating radio frequency quadrupole (RFQD) has been put in operation at CERN. It decelerat...
A novel system for real-time tune measurement during deceleration of a low-intensity particle beam i...
A simplified scheme for the provision of antiprotons at 100 MeV/c based on fast extraction is descri...
This contribution will describe the new orbit system foreseen for the Antiproton Decelerator (AD) lo...
International audienceThe GBAR (Gravitational Behavior of Antihydrogen at Rest) experiment at CERN r...
The RFQD decelerates antiprotons from a momentum of 100 MeV/c (kinetic energy 5.31 MeV) down to a ki...
The CERN Antiproton Decelerator (AD) produces low-energy antiprotons for studies of antimatter. A 26...
The Relativistic Heavy Ion Collider, now in construction at Brookhaven National Laboratory, will use...
Abstract--More than 6DO switch mode power converters are installed in LEP to power the Main Ring Mag...
This report outlines the future program of the BASE antiproton experiment at the Antiproton Decelera...
In the Antiproton Decelerator (AD) Target Area antiprotons are produced by the collisions of 26 GeV/...
The CERN accelerator complex consists of several generations of particle accelerators, with around 5...