Abstract: Concrete face rockfill dams (CFRDs) are gaining a worldwide recognition as the most economical type of dams to be constructed in extreme northern and sub-Antarctic regions. Height of CFRDs may exceed 200 m. Safety of CFRDs depends on the proper design, construction, and monitoring of actual behaviour during the construction and during the operation of the structure. The main concern for the safety of CFRDs is the deformation of the concrete face. During the reservoir filling, the load of the water and deformations of the dam rockfill, force upstream concrete slab to deform. The displacements of the concrete face during the reservoir filling should not exceed the maximum allowed values in order to maintain the structural integrity ...
Time dependent creep settlements are one of the most important causes of material deteriorations for...
AbstractThe concrete-faced rockfill dam (CFRD) is an important dam type in the selection of high dam...
The concrete-faced rockfill dam (CFRD) is an important dam type in the selection of high dams to be ...
Chinas economy is growing rapidly and this creates an enormous demand for energy. China’s government...
The Shahr-e-Bijar dam is a 96.5 m high and 430 m long concrete faced rock-fill dam with reservoir vo...
Concrete Faced Rockfill Dams (CFRD’s) are commonly built around the world. As energy demands soar an...
The author considered the results of the numerical studies of stress-strain state of a 100 m high ro...
In the CFRD dams, a concrete-face with a finite thickness is placed on the upstream side of the dam,...
A numerical modeling of high concrete face rockfill dam (CFRD) has been considered in order to bette...
High concrete-face rockfill dams (CFRDs) with heights of over 100 m have been quickly developed in r...
Rockfill dams are embankment type of dams whose stability primarily depends onrock properties. The t...
This study deals with a 2-D plane strain finite element analysis of elastic linear (Hooke’s law) and...
Due to the demand in flood season for power generation, the first-stage face slab of a high concrete...
ABSTRACT Introduction. The article considers results of research of reinforced-concrete face stress-...
The functions of dams are for water supply, flood control and hydroelectric power generation. A conc...
Time dependent creep settlements are one of the most important causes of material deteriorations for...
AbstractThe concrete-faced rockfill dam (CFRD) is an important dam type in the selection of high dam...
The concrete-faced rockfill dam (CFRD) is an important dam type in the selection of high dams to be ...
Chinas economy is growing rapidly and this creates an enormous demand for energy. China’s government...
The Shahr-e-Bijar dam is a 96.5 m high and 430 m long concrete faced rock-fill dam with reservoir vo...
Concrete Faced Rockfill Dams (CFRD’s) are commonly built around the world. As energy demands soar an...
The author considered the results of the numerical studies of stress-strain state of a 100 m high ro...
In the CFRD dams, a concrete-face with a finite thickness is placed on the upstream side of the dam,...
A numerical modeling of high concrete face rockfill dam (CFRD) has been considered in order to bette...
High concrete-face rockfill dams (CFRDs) with heights of over 100 m have been quickly developed in r...
Rockfill dams are embankment type of dams whose stability primarily depends onrock properties. The t...
This study deals with a 2-D plane strain finite element analysis of elastic linear (Hooke’s law) and...
Due to the demand in flood season for power generation, the first-stage face slab of a high concrete...
ABSTRACT Introduction. The article considers results of research of reinforced-concrete face stress-...
The functions of dams are for water supply, flood control and hydroelectric power generation. A conc...
Time dependent creep settlements are one of the most important causes of material deteriorations for...
AbstractThe concrete-faced rockfill dam (CFRD) is an important dam type in the selection of high dam...
The concrete-faced rockfill dam (CFRD) is an important dam type in the selection of high dams to be ...