A wideband low-output-impedance RF system for the second harmonic cavities in the ISIS synchrotron has been developed by collaboration between Argonne National Laboratory (US), KEK (Japan) and Rutherford Appleton Laboratory (UK). The system has less than 30 Ω of output impedance over the frequency range of 2.7 – 6.2 MHz. Precise control of the second harmonic voltage can then be realized without considering beam loading effects. A beam test with this system is planned at the ISIS synchrotron in 2009
The Medium-energy Electron Ion Collider (MEIC), proposed by Jefferson Lab, consists of a series of a...
The longitudinal impedance of a linear array of cylin-drically symmetric cavities connected by side ...
The use of beam bunch phase monitoring in setting up the rf operaling parameters of a multi-cavity l...
A wideband low-output-impedance RF system for the second harmonic cavity in the ISIS synchrotron has...
In the ISIS facility at Rutherford Appleton Laboratory (RAL) in the UK, a second target station proj...
Heavy beam loading in the PEP-II B Factory along with large ring circumferences places unique requir...
In a high intensity proton synchrotron, the wall current induced by the beam in an RF cavity can not...
Heavy beam loading in the PEP-II B Factory along with large ring circumferences places unique requir...
Since all experimental and theoretical evidence indicates that the beam intensity in the PSB is at p...
Heavy beam loading in PEP-II has driven the design of the low level RF system to contain feedback lo...
A novel beam-based method for measuring the longitudi-nal impedance spectrum is demonstrated using e...
A new technique for the Smith Chart display of RF cavity impedance is described. The system was deve...
The longitudinal impedance seen by the beam is about 3 kOhms per SIS cavity. For the planned high cu...
In the framework of the "LHC Injectors Upgrade" (LIU) project, the CERN Proton Synchrotron (PS) is b...
A klystron is an important vacuum device which is useful in medical linear accelerators because it a...
The Medium-energy Electron Ion Collider (MEIC), proposed by Jefferson Lab, consists of a series of a...
The longitudinal impedance of a linear array of cylin-drically symmetric cavities connected by side ...
The use of beam bunch phase monitoring in setting up the rf operaling parameters of a multi-cavity l...
A wideband low-output-impedance RF system for the second harmonic cavity in the ISIS synchrotron has...
In the ISIS facility at Rutherford Appleton Laboratory (RAL) in the UK, a second target station proj...
Heavy beam loading in the PEP-II B Factory along with large ring circumferences places unique requir...
In a high intensity proton synchrotron, the wall current induced by the beam in an RF cavity can not...
Heavy beam loading in the PEP-II B Factory along with large ring circumferences places unique requir...
Since all experimental and theoretical evidence indicates that the beam intensity in the PSB is at p...
Heavy beam loading in PEP-II has driven the design of the low level RF system to contain feedback lo...
A novel beam-based method for measuring the longitudi-nal impedance spectrum is demonstrated using e...
A new technique for the Smith Chart display of RF cavity impedance is described. The system was deve...
The longitudinal impedance seen by the beam is about 3 kOhms per SIS cavity. For the planned high cu...
In the framework of the "LHC Injectors Upgrade" (LIU) project, the CERN Proton Synchrotron (PS) is b...
A klystron is an important vacuum device which is useful in medical linear accelerators because it a...
The Medium-energy Electron Ion Collider (MEIC), proposed by Jefferson Lab, consists of a series of a...
The longitudinal impedance of a linear array of cylin-drically symmetric cavities connected by side ...
The use of beam bunch phase monitoring in setting up the rf operaling parameters of a multi-cavity l...