In October 2000, final closure was initiated of U-3ax/bl, a mixed waste disposal unit at the Nevada Test Site (NTS). The application of approximately 30 cm of topsoil, composed of compacted native alluvium onto an operational cover, seeding of the topsoil, installation of soil water content sensors within the cover, and deployment of a drainage lysimeter facility immediately adjacent to the disposal unit initiated closure. This closure is unique in that it required the involvement of several U.S. Department of Energy (DOE
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resou...
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the...
The U-3auS Disposal Site Corrective Action Unit (CAU) 333 is a closed construction landfill located ...
In October 2000, final closure was initiated of U-3ax/bl, a mixed waste disposal unit at the Nevada ...
In December 2000, a performance monitoring facility was constructed adjacent to the U-3ax/bl mixed w...
This Closure Plan has been prepared for the Area 3 RWMS U-3ax/bl Disposal Unit Corrective Action Uni...
In December 2000, a performance monitoring facility was constructed adjacent to the mixed waste disp...
This Closure Report (CR) has been prepared for the Area 3 Radioactive Waste Management Site (RWMS) U...
This Post-Closure Inspection and Monitoring report provides the results of inspections and monitorin...
This inspection and monitoring report has been prepared for the Area 3 Waste Management Division (WM...
This closure report provides the documentation for closure of the Cactus Spring Waste Trenches Corre...
Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in...
The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO...
This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes...
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 547...
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resou...
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the...
The U-3auS Disposal Site Corrective Action Unit (CAU) 333 is a closed construction landfill located ...
In October 2000, final closure was initiated of U-3ax/bl, a mixed waste disposal unit at the Nevada ...
In December 2000, a performance monitoring facility was constructed adjacent to the U-3ax/bl mixed w...
This Closure Plan has been prepared for the Area 3 RWMS U-3ax/bl Disposal Unit Corrective Action Uni...
In December 2000, a performance monitoring facility was constructed adjacent to the mixed waste disp...
This Closure Report (CR) has been prepared for the Area 3 Radioactive Waste Management Site (RWMS) U...
This Post-Closure Inspection and Monitoring report provides the results of inspections and monitorin...
This inspection and monitoring report has been prepared for the Area 3 Waste Management Division (WM...
This closure report provides the documentation for closure of the Cactus Spring Waste Trenches Corre...
Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in...
The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO...
This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes...
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 547...
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resou...
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the...
The U-3auS Disposal Site Corrective Action Unit (CAU) 333 is a closed construction landfill located ...