Abstract:- Fuzzy resource-constrained project scheduling with multiple performance modes covers the majority of possible situations in practice. This type of scheduling is a typical complex combinatorial optimization problem. Exact approaches may not be viable. To solve this type of problem efficiently and effectively, four metaheuristic approaches, fuzzy GA alone, fuzzy GA with tabu, fuzzy SA and fuzzy SA with tabu have been developed and built into a system in this research. Each approach has its own advantage depending on circumstances. The system developed has practical significance in solving fuzzy project scheduling in realistic settings, providing a number of efficient and effective approaches
In the real world, projects are subject to numerous uncertainties at different levels of planning. F...
This paper proposes an improved critical chain method with fuzzy approach to schedule projects under...
Demonstrates the feasibility of applying fuzzy set theory to construction network scheduling
The resource-constrained project scheduling problem belongs to the class of decision problems that h...
Project scheduling is one of the most important and applicable concepts of project management. Many ...
Abstract. In this research at first some of the most important previous studies in the field of fuzz...
In this study, the problem of project selection and scheduling with resource management is considere...
This research proposes a pre-emptive fuzzy goal programming model for multi-objective multi-mode res...
This research studies resource constrained project scheduling problem in a part of a refinery constr...
Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articl...
To schedule a project, you need to pay attention to the uncertainty about some of the project's para...
which permits unrestricted use, distribution, and reproduction in any medium, provided the original ...
In fuzzy mathematical programming literature, most of the transformation approaches were mainly focu...
Paper presents the original method of construction scheduling using fuzzy sets theory. The essence o...
The manufacturing system of seismicisolators has a project-based production process and therefore, i...
In the real world, projects are subject to numerous uncertainties at different levels of planning. F...
This paper proposes an improved critical chain method with fuzzy approach to schedule projects under...
Demonstrates the feasibility of applying fuzzy set theory to construction network scheduling
The resource-constrained project scheduling problem belongs to the class of decision problems that h...
Project scheduling is one of the most important and applicable concepts of project management. Many ...
Abstract. In this research at first some of the most important previous studies in the field of fuzz...
In this study, the problem of project selection and scheduling with resource management is considere...
This research proposes a pre-emptive fuzzy goal programming model for multi-objective multi-mode res...
This research studies resource constrained project scheduling problem in a part of a refinery constr...
Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articl...
To schedule a project, you need to pay attention to the uncertainty about some of the project's para...
which permits unrestricted use, distribution, and reproduction in any medium, provided the original ...
In fuzzy mathematical programming literature, most of the transformation approaches were mainly focu...
Paper presents the original method of construction scheduling using fuzzy sets theory. The essence o...
The manufacturing system of seismicisolators has a project-based production process and therefore, i...
In the real world, projects are subject to numerous uncertainties at different levels of planning. F...
This paper proposes an improved critical chain method with fuzzy approach to schedule projects under...
Demonstrates the feasibility of applying fuzzy set theory to construction network scheduling