Abstract: Mechanical excavation of tunnels using Road-header is getting widespread and popular due to their capability of excavating precisely soft to medium strength rock without weakening the surrounding rock. Road-header is flexible, very mobile, safe, and environmentally friendly machinery. It can excavate smoothly various sizes, shapes, and types of tunnel openings. Accurate and reliable productivity prediction for the selected machinery is required for time and resource scheduling, and hence estimating the budget of any tunnelling project. Simulation can be used to study tunnelling operations using Road-headers before they are actually performed. It will assist decision makers to predict productivity and to control time, cost, and res...
The effect of terrain factors on productivity in subgrade preparation by excavator was studied. The ...
Intact rock properties together with rock mass characteristics should be well investigated for selec...
Massachusetts Institute of Technology, Dept. of Civil Engineering. Thesis. 1971. M.S.MICROFICHE COPY...
Productivity of the Tunnel Boring Machines (TBM) is always a concern when bored tunnelling is used i...
The main purpose of the thesis work has been to improve the existing prediction models and to provid...
Mechanized excavation in soft rock has been extensively studied in the field of mining when machine...
ABSTRACT: Drilling and blasting is widely used in underground excavation projects. Timing is conside...
The goal of a mining operation is to extract the maximum value from exploiting the orebody. The equi...
Singapore has been developing rapidly in the recent years and the issue with shortage of land has be...
The construction industry as a whole has not increased its productivity level as much as other indus...
This study deals with industrial trends in tunnelling by drill and blast (D&B). We perform a statist...
Tunnel boring machine applies in tunnel construction and in mining operation. During the last years,...
A GPS-based earthmoving system for construction, which is the state-of-the art in earthmoving, was c...
WOS: 000330150700004Using mechanical miners such as roadheaders may be a solution to increase the pr...
Improving construction productivity is essential today due to stringent financial resources. Micro-c...
The effect of terrain factors on productivity in subgrade preparation by excavator was studied. The ...
Intact rock properties together with rock mass characteristics should be well investigated for selec...
Massachusetts Institute of Technology, Dept. of Civil Engineering. Thesis. 1971. M.S.MICROFICHE COPY...
Productivity of the Tunnel Boring Machines (TBM) is always a concern when bored tunnelling is used i...
The main purpose of the thesis work has been to improve the existing prediction models and to provid...
Mechanized excavation in soft rock has been extensively studied in the field of mining when machine...
ABSTRACT: Drilling and blasting is widely used in underground excavation projects. Timing is conside...
The goal of a mining operation is to extract the maximum value from exploiting the orebody. The equi...
Singapore has been developing rapidly in the recent years and the issue with shortage of land has be...
The construction industry as a whole has not increased its productivity level as much as other indus...
This study deals with industrial trends in tunnelling by drill and blast (D&B). We perform a statist...
Tunnel boring machine applies in tunnel construction and in mining operation. During the last years,...
A GPS-based earthmoving system for construction, which is the state-of-the art in earthmoving, was c...
WOS: 000330150700004Using mechanical miners such as roadheaders may be a solution to increase the pr...
Improving construction productivity is essential today due to stringent financial resources. Micro-c...
The effect of terrain factors on productivity in subgrade preparation by excavator was studied. The ...
Intact rock properties together with rock mass characteristics should be well investigated for selec...
Massachusetts Institute of Technology, Dept. of Civil Engineering. Thesis. 1971. M.S.MICROFICHE COPY...